My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 2:41:45 PM
Creation date
5/29/2013 1:16:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
76. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the project developer/subdivider. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> 77. The in-lieu park dedication fees shall be paid to the City prior to approval of the <br /> map, at the rate then in effect, for the total number of buildable lots on the map, <br /> unless this requirement has been otherwise satisfied. <br /> URBAN STORMWATER CONDITIONS OF APPROVAL <br /> 78. The project shall comply with the City of Pleasanton's Stormwater NPDES Permit <br /> #CAS612008, dated October 14, 2009 and amendments (hereafter referred to as <br /> NPDES Permit). This NPDES Permit is issued by the California Regional Water <br /> Quality Control Board, San Francisco Bay Region (hereafter referred to as <br /> Regional Water Quality Control Board). Information related to the NPDES Permit <br /> is available at the City of Pleasanton Community Development Department, <br /> Engineering Division, and on line at: <br /> • http://www.ci.pleasanton.ca.us/business/planning/StormWater.html <br /> • http://www.waterboards.ca.gov/sanfranciscobay/water issues/programs/storm <br /> water/Municipal/index.shtml <br /> A. Design Requirements <br /> 1. NPDES Permit design requirements include, but are not limited to, the following: <br /> a. Source control, site design, implementation, and maintenance standards <br /> when a regulated project (such as a commercial, industrial, residential <br /> subdivision, mixed use, or public project) creates and/or replaces 10,000 <br /> square feet or more of impervious surface (5,000 square feet for auto service <br /> facilities, retail gasoline outlets, restaurants, and uncovered parking lots), <br /> including roof area, street, and sidewalk. <br /> b. Hydromodification standards when a regulated project creates and/or <br /> replaces a total impervious area of one acre or more. <br /> c. Compliance with a Diazinon pollutant reduction plan (Pesticide Plan) to <br /> reduce or substitute pesticide use with less toxic alternatives. <br /> d. Compliance with a Copper Pollutant Reduction Plan and a Mercury Pollutant <br /> Reduction Plan. <br /> 2. The following requirements shall be incorporated into the project: <br /> Page 11 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.