My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 2:41:45 PM
Creation date
5/29/2013 1:16:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
58. All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall be limited to the hours of <br /> 8:00 a.m. to 5:00 p.m., Monday through Friday. No construction shall be allowed <br /> on State or Federal Holidays. The Director of Community Development may allow <br /> earlier "start times" or later "stop times" for specific construction activities, e.g., <br /> concrete pouring. All construction equipment must meet Department of Motor <br /> Vehicles (DMV) noise standards and shall be equipped with muffling devices. <br /> Prior to construction, the hours of construction shall be posted on site. <br /> Engineering <br /> 59. A "Conditions of Approval" checklist shall be completed and attached to all plan <br /> checks submitted for approval indicating that all conditions have been satisfied. <br /> 60. The project developer/subdivider shall post with the City, prior to approval of the <br /> final map/parcel map, a separate labor and material bond, performance bond and <br /> maintenance bond for the full value of all subdivision improvements. This bond <br /> shall be in a standard form approved by the City Attorney and shall be in an <br /> amount satisfactory to the City Engineer. The City Engineer may waive this <br /> requirement if the required improvements have been satisfactorily installed prior to <br /> approval of the map. <br /> 61. The project developer/subdivider shall grant an easement to the City over those <br /> parcels needed for public service easements (P.S.E.) and which are approved by <br /> the City Engineer, or other easements, which may be designated by the City <br /> Engineer. <br /> 62. There shall be no direct roof leaders connected to the street gutter/parking lot or <br /> storm drain system, unless otherwise approved by the City Engineer. <br /> 63. A water meter shall be provided to each lot of record within the development <br /> unless otherwise approved by the City Engineer. <br /> 64. A sanitary sewer lateral with two-way cleanout (located at the back of the sidewalk <br /> or curb, whichever is applicable) shall be provided to each lot of record within the <br /> development unless otherwise approved by the City Engineer. <br /> 65. The project developer/subdivider shall construct vertical P.C.C. curbs and gutters <br /> within this development unless otherwise approved by the City Engineer. When <br /> the sidewalk is adjacent to the curb and gutter, they shall be poured monolithically. <br /> 66. For new streets, the minimum grade for the gutter flow line shall be set at one <br /> percent where practical, but not less than .75% unless otherwise approved by the <br /> City Engineer. The existing streets shall have grade to match existing site <br /> conditions subject to review by the City Engineer. <br /> Page 9 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.