My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2013 1:13:30 PM
Creation date
5/29/2013 1:10:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site(s) affected: All <br /> (Draft SEIR, pp. 4.J-16 to 4.J-18.) <br /> Impact 4.J-2 <br /> Construction associated with development facilitated by the General Plan <br /> Amendment and rezonings could potentially generate ground-borne vibration at neighboring <br /> sensitive uses. <br /> The SEIR evaluates the impact of the proposed project related to generate <br /> ground-borne vibration at neighboring sensitive uses. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes or alterations have been required in or incorporated into the <br /> Project that would avoid or substantially lessen the significant environmental <br /> effect as identified in the SEIR. Mitigation Measure 4.J-2 which is required in or <br /> incorporated into the Project, will reduce the significant environmental impact to a <br /> less than significant level. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 1. Vibration exposure at sensitive uses located near <br /> construction sites could exceed the applicable criteria in situations where pile <br /> driving or similar vibration-producing activity occurs. <br /> 2. Implementation of Mitigation Measure 4.J-2 set forth in <br /> Table 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.J-2 <br /> would be reduced to a less than significant level and is hereby incorporated by <br /> reference and described below. <br /> 4.J-2: The City shall require developers on the potential sites for rezoning to <br /> conduct a vibration study which will estimate vibration levels at neighboring <br /> sensitive uses, and if required, provide mitigation efforts needed to satisfy the <br /> applicable construction vibration level limit established in Table 4.J-4. It is <br /> expected that vibration mitigation for all project sites will be reasonable and <br /> feasible. <br /> Site(s) affected: All <br /> (Draft SEIR, 4.J-18 to 4.J-19.) <br /> Impact 44-3 <br /> Development facilitated by the General Plan Amendment and rezonings could <br /> potentially locate residential uses near an existing rail line. Future residents could potentially be <br /> exposed to excessive exterior and interior noise exposure from train noise events. <br />
The URL can be used to link to this page
Your browser does not support the video tag.