My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2013 1:13:30 PM
Creation date
5/29/2013 1:10:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction plan shall be included on all grading, utility, building, landscaping, <br /> and improvement plans during all phases of construction, access roads, parking <br /> areas and staging areas at construction sites. <br /> Site(s) affected: All <br /> (Draft SEIR, pp. 4.B-14 to 4.B-16.) <br /> Impact 4.B-4 <br /> Development facilitated by the General Plan Amendment and rezonings could <br /> potentially include residential or mixed-use developments that could expose sensitive receptors <br /> to substantial health risk from diesel particulate matter ("DPM") and other toxic air contaminants <br /> ("TAC") from mobile and stationary sources. <br /> The SEIR evaluates the impact of the proposed project related to the exposure of <br /> sensitive receptors to diesel particulate matter (DPM) and other toxic air contaminants (TACs) <br /> from mobile and stationary sources. Roadway traffic, especially on Interstates 580 and 680, <br /> would be the primary sources of TACs near the potential sites for rezoning. In addition, <br /> BAAQMD indicates that there are 40 permitted TAC sources within 1,000 feet of one or more <br /> potential sites for rezoning. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes or alterations have been required in or incorporated into the <br /> Project that would avoid or substantially lessen the significant environmental <br /> effect as identified in the SEIR. Mitigation Measure 4.8-4, which has been <br /> required in or incorporated into the Project, will reduce the significant <br /> environmental impact to a less than significant level. <br /> Facts in Supped of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 1. Some of the potential sites for rezoning are within areas of <br /> concern from the TAC emissions from one or more of the stationary TAC <br /> sources. On-road vehicular traffic on nearby highway segments and arterials <br /> could also expose new residences on the potential sites for rezoning to TAC <br /> sources. <br /> 2. Implementation of Mitigation Measure 4.B-4 set forth in <br /> Table 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.B-4 <br /> would be reduced to a less than significant level and is hereby incorporated by <br /> reference and described below: <br /> 4.B-4: Reduce Exposure to TACs. On project sites where screening thresholds <br /> are exceeded, the following measures shall be implemented for development on <br /> all the potential sites for rezoning to reduce exposure to TACs and improve <br /> indoor and outdoor air quality: <br />
The URL can be used to link to this page
Your browser does not support the video tag.