My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2013 12:51:46 PM
Creation date
5/29/2013 12:51:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$2,000 and $25,000 for each capital project, and are dependent on the size, types of <br /> services and complexity of the job. <br /> Approval of these contracts authorizes staff to spend up to the aggregate amount of the <br /> $500,000 between the three firms over a three year period, which will likely consist of <br /> 10-20 separate project authorizations over the life of the contracts. The proposed <br /> contracts with BKF Engineers, Kimley-Horn and Associates, Inc., and Pakpour <br /> Consulting Group, Inc. for general civil engineering professional services are attached. <br /> Submitted by: Fiscal Review: Approve by: <br /> Brian Dolan Emily Wagner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Proposed consultant contract with BKF Engineers Inc. <br /> 2. Proposed consultant contract with Kimley-Horn and Associates, Inc. <br /> 3. Proposed consultant contract with Pakpour Consulting Group, Inc. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.