Laserfiche WebLink
0. EXHIBIT A <br /> CITY OF PLEASANTON <br /> ON CALL SURVEY CONTRACT <br /> KIER E WRIGHT HOURLY RATE SCHEDULE <br /> Civil Engineers € Surveyors, Inc. Effective July 1, 2013 through June 30, 2014 <br /> Note-Rates are to be adjusted annually and will be submitted every March beginning in <br /> 2014 <br /> PRINCIPAL $ 206.00/Hour <br /> PRINCIPAL ENGINEER $ 186.00/Hour <br /> SENIOR ENGINEER $ 166.00/Hour <br /> OFFICE ENGINEER $ 150.00/Hour <br /> SENIOR SURVEYOR $ 168.00/Hour <br /> SURVEY SUPERVISOR $ 168.00/Hour <br /> OFFICE SURVEYOR $ 150.00/Hour <br /> SURVEY COORDINATOR $ 144.00/Hour <br /> ENGINEERING TECH $ 129.00/Hour <br /> SURVEY TECH $ 129.00/Hour <br /> RESEARCH ASSISTANT $ 73.00/Hour <br /> SENIOR DRAFTSMAN $ 105.00/Hour <br /> DRAFTSMAN $ 100.00/Hour <br /> 2-MAN SURVEY CREW $ 257.00/Hour <br /> 3-MAN SURVEY CREW $ 327.00/Hour <br /> TESTIMONY (TRIAL OR DEPOSITION) $ 402.00/Hour <br /> TECHNICAL TYPIST $ 65.00/Hour <br /> ENGINEERING INTERN $ 43.00/Hour <br /> All blueprinting and reproduction will be billed at cost plus 10%.Time spent <br /> t for preparation for testimony will be billed in accordance with the above <br /> hourly rates. <br /> 2850 Collier Canyon Road • Livermore, California 94551-9201 • (925)245-8788 • FAX (925)245-8796 <br />