Laserfiche WebLink
EXHIBIT A Page 2 of 2 <br /> CITY OF PLEASANTON <br /> On-Call Geotechnical Engineering and Matedats Testing Services <br /> Schedule of Fees-luly 1,2013 through lune 30,2014 <br /> SOIL-CEMENT SOILS <br /> Freeze Thaw Abrasion(ASTM 0560) $ 520.00 %Organics in Soil(ASTM D2974) 110.00 <br /> Soil Cement Compression(ASTM D1633) $ 200.00 CUR at 100%(ASTM D1883 or AASHTO T-180) 415.00 <br /> Wet/Dry Abrasion Soil Cement(ASTM 0559) $ 500.00 CSR at 95%(ASTM D1883 or AASHTO T-180) 825.00 <br /> Cement Content Soil Cement(ASTM C1084) $ 200.00 Consolidation(ASTM 02435) 345.00 <br /> Preparation of Soil-Cement Samples $ 625.00 Consolidation,Extra Points(ASTM D2435) 45.00 <br /> Soil-Lime Proportion Requirement(ASTM 06276) $ 255.00 Corrosivity-Sulfate,Chloride,Sulfide 105.00 <br /> Corroslvity-Soil pH Test 40.00 <br /> STEEL Caltrans Maximum Wet Density(CT 216) 180.00 <br /> Brinell Hardness of Steel(ASTM E10) $ 80.00 Modified Proctor,4"Mold(ASTM/AASHTO) 170.00 <br /> Slip and Tenth Rebar Couplers(CT 670) $ 155.00 Modified Proctor,6"mold(ASTM D1557) 210.00 <br /> Face Bend of Steel $ 45.00 Remolded Direct Shear(ASTM 03080) 220.00 <br /> Rockwell H ardness of Steel(ASTM E18) $ 80.00 Direct Shear(ASTM D3080) 180.00 <br /> Root Bend of Weld Coupon $ 45.00 Expansion Index of Soils(UBC No.29) 190.00 <br /> Side Bend of Weld Coupon $ 45.00 Flexible Wall Permeability(ASTM 05084) 365.00 <br /> Tensile&Bend of Rebar,413-48 $ 120.00 Collapse Potential of Soils(ASTM D2435) 170.00 <br /> Tensile&Bend of Rebar,#9-#11 5 120.00 Minus#200 Wash,Soil(ASTM 01140) 70.00 <br /> Tensile Test of Steel Coupon $ 65.00 Moisture Content of Soils(ASTM D2216) 35.00 <br /> Portable Pier Vertical Load $ 30.00 Proctor Check Point,All Methods 110.00 <br /> Portable Pier Horizontal Load $ 55.00 Plasticity Index(ASTM D4318) 170.00 <br /> Bend Test of Steel Coupon $ 55.00 Minimum Resistivity of Soils(CT 643) 115.00 <br /> R-Value of Soils(CT 301) 220.0 <br /> Sieve Analysis w/Wash(ASTM D422) 140.00 <br /> Specific Gravity of Soil(ASTM 0854) 130.00 <br /> PLYWOOD Standard Proctor,4"(ASTM/AASHTO) 160.00 <br /> Load Test of Plywood Panels,Avg.of 3 $ 605.00 One-Dimon Swell of Soil(ASTM D4546) 95.00 <br /> Tube Density&Moisture Content of Soil 30.00 <br /> Visual Classification(ASTM 02488) 35.00 <br /> Double Hydrometer(ASTM 04221) 170.00 <br /> CARBON Unconfined Compression(ASTM 02166) 105.00 <br /> Carbon Ro-Tap Abrasion $ 155.00 Sample Preparation 55.00 <br /> Carbon Sieve Analysis $ 78.00 Rigid Wall Permeability(ASTM D2434) 235.00 <br /> Oxidation Reduction of Soil 45.00 <br /> Crumb Test Dlsperstion(ASTM D6572) 65.00 <br /> Calibration of Sand 80.00 <br /> MACHINING Shrinkage Limits of Soils(ASTM 0427) 170.00 <br /> Machining Charges for Sample Preparation $ 90.00 Remolded Flexwall Perm(ASTM D5084) 465.00 <br /> Pinhole Depression Test(ASTM) 210.00 <br /> Remolded Consolidation(ASTM 02435) 295.00 <br /> Treated Expansion Index(UBC Std 18-2) 190.00 <br /> COATINGS Treated R-Value Test 245.00 <br /> Wt of Galvanized Coating(ASTM A 90) $ 77.00 Minimum Index Density of Soils(ASTM D4254) 65.00 <br /> The rates and basis of charges presented above are specific to the City of Pleasanton On-Coll Geotechnkal Engineering and Materials Testing Services agreement between <br /> x4'1,2013 and lune30,2014.Annual adjustments will be submitted prior to the end of the.seal year for approval by the City. <br /> BSR will submit invoices to the O4'of Pleasanton periodically,but no more frequently than every two(2)weeks.All invoices are due and payable upon presentation,and <br /> any amounts unpaid 30 days after the Invoice date are subject too late payment charge from the date of the Invoke,at 1-1/2%per month or the maximum legal rate, <br /> whichever is lower. The Oty will reimburse Company for all time spent and expenses(Including fees of any attorney,collection agency,ad/or court costs)Incurred In <br /> connection with collecting any delinquent amount. <br /> BSK <br />