Laserfiche WebLink
GEOCON <br /> CONSULTANTS, INC. ler) <br /> ---- _..--- -- - - __- ------ E--- <br /> G E O T E C H N I C C A L • E N V I R O N M E N T A L • M A T E R I A L S <br /> EXHIBIT A <br /> SCHEDULE OF FEES - JULY 1 , 2013 THROUGH JUNE 30, 2014 <br /> PROFESSIONAL SERVICES <br /> Engineering Field Technician/Special Inspector I(Including Equipment and Nuclear Gauge) $70/$95(PW)*/hr. <br /> Engineering Field Technician/Special Inspector II(Including Equipment and Nuclear Gauge) 80/105(PW)*/hr. <br /> Engineering Field Technician/Special Inspector III(Including Equipment and Nuclear Gauge) 90/115(PW)*/hr. <br /> Word Processor/Technical Editor 70/hr. <br /> Engineering/Research Assistant/Technical Illustrator 80/hr. <br /> Project Coordinator/GIS Specialist 90/hr. <br /> Staff Engineer/Geologist 100/hr. <br /> Senior Staff Engineer/Geologist 110/hr. <br /> Project Engineer/Geologist 120/hr. <br /> Senior Project Engineer/Geologist 130/hr. <br /> Senior Engineer/Geologist/Geophysicist 150/hr. <br /> Associate Engineer/Geologist 180/hr. <br /> Principal Engineer/Geologist/Litigation Support 220/hr. <br /> Deposition or Court Appearance 400/hr. <br /> Overtime and Saturday Rate 1.5 X Regular Hourly Rate <br /> Sunday and Holiday Rate 2 X Regular Hourly Rate <br /> Minimum Professional Fee $500/Project <br /> Minimum Field Services Fee(per day or call-out) 2 Hours <br /> *Prevailing Wage(PW)Califcrnia Labor Code§720,et. Seq. <br /> TRAVEL <br /> Personnel Regular Hourly Rate <br /> Concrete Cylinder Pickup(Flat Rate) $75/trip <br /> Vehicle Mileage 0.75/mile <br /> EQUIPMENT&ANALYTICAL TESTS <br /> Pick-up Truck $125/day 48-hour Turn-Around-Time 60%surcharge <br /> Equipment Truck 200/day Level D PPE/Decon Rinse Equipment 50/day <br /> Direct-Push Rig/Operator 165/190(PW)*/hr pH/Conductivity/Temperature Meter 50/day <br /> Direct-Push Sample Liner 5/ea. 55-gallon drum 55/ea. <br /> Earth Resistivity Meter 100/day TPHg/BTEX(EPA 8015M/8021B) 70/ea. <br /> Coring Machine(concrete,asphalt,masonry) 175/day TPHg/BTEX/MTBE(EPA 8015M/8260B) 100/ea. <br /> Generator or Air Compressor 100/day TPHd/TPHmo(EPA 8015M) 75/ea. <br /> GPS Unit 160/day Fuel Oxygenate Compounds(EPA 8260B) 110/ea. <br /> Drive-Tube Sampler or Hand-Auger 40/day Volatile Organic Compounds(EPA 8260B) 150/ea. <br /> Soil Sample Tube(Brass or Stainless) 10/ea. Semi-Volatile Organic Compounds(EPA 8270) 300/ea. <br /> Water Level Indicator 40/day CAM 17 Metals(EPA 6010B) 170/ea. <br /> Stainless Sampling Pump 150/day Single Metal(EPA 6010B) 20/ea. <br /> Battery-Powered Pump 75/day WET or TCLP Extraction 75/ea. <br /> Photo-Ionization Meter $125/day Soil pH(EPA 9045C) 20/ea. <br /> LABORATORY TESTS <br /> COMPACTION CURVES SOIL AND AGGREGATE STABILITY <br /> 4-inch mold(D1557/D698) $135/ea. Resistance Value,R-Value(D2844iCAL301) $275/ea. <br /> 6-inch mold(D1557/D698) 150/e a. R-Value,Treated(CAL301) 300/ea. <br /> California Impact(CAL216) 180/ea. California Bearing Ratio(D1883) 175/pt. <br /> Check Point 85/e a. Stabilization Ability of Lime(C977) 180/ea. <br /> 6671 Brisa Street • Livermore, California 94550 • Tel (925) 371-5900 • Fax (925) 371-5915 <br /> Page 1 of 2 <br />