My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
052113
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2013 4:26:15 PM
Creation date
5/14/2013 12:23:22 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/21/2013
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
removal, affordable housing, Growth Management, and developable square footage in <br /> Hacienda. <br /> PUD FINDINGS <br /> Please refer to the attached Planning Commission staff report, pages 26-31, for a <br /> discussion of the considerations needed to approve the proposed PUD development <br /> plan. <br /> PUBLIC NOTICE <br /> Notice regarding the proposed project and related City Council public hearing were <br /> mailed to property owners within 1,000 feet of the subject property. At the time this <br /> report was written, staff had not received any public comments in response to this <br /> notice. <br /> ENVIRONMENTAL ASSESSMENT <br /> On January 4, 2012, the City Council certified a Supplemental Environmental Impact <br /> Report (SEIR) and adopted the California Environmental Quality Act (CEQA) Findings <br /> and a Statement of Overriding Considerations for the Housing Element update and <br /> Climate Action Plan General Plan Amendment and Rezonings. This SEIR was a <br /> supplement to the EIR prepared for the Pleasanton 2005-2025 General Plan which was <br /> certified in July 2009. The subject property was one of 21 potential housing sites <br /> analyzed in the SEIR. Up to 168 multi-family housing units were analyzed in the SEIR <br /> for this site. <br /> Under CEQA, once an EIR has been prepared for a project, the lead agency (in this <br /> case, the City) is not required to prepare a subsequent or supplemental EIR unless <br /> certain conditions are met as specified in CEQA. Staff believed that the conditions <br /> described in CEQA have not occurred and that a subsequent or supplemental EIR was <br /> not required for this project. CEQA further states that a lead agency shall prepare an <br /> addendum to a previously certified EIR if some changes or additions are necessary, but <br /> none of the conditions calling for the preparation of a subsequent EIR have occurred. <br /> Therefore, an addendum to the SEIR was prepared for this project. <br /> The analysis in the Addendum to the SEIR (Attachment 7, Exhibit E) determined that <br /> the proposed project will not trigger any new or more severe significant environmental <br /> impacts as compared to those analyzed in the context of the SEIR and confirmed that <br /> none of the conditions requiring the preparation of a subsequent or supplemental EIR <br /> occurred. Therefore, the previously prepared SEIR and Addendum to the SEIR, taken <br /> together, are determined to be adequate to serve as the environmental documentation <br /> for this project and satisfy all the requirements of CEQA. <br /> The SEIR for the Housing Element update included a Statement of Overriding <br /> Considerations for two significant and unavoidable impacts: development facilitated by <br /> the General Plan Amendment and rezonings could potentially add traffic to the regional <br /> roadway network to the point at which they would operate unacceptably under <br /> Cumulative Plus Project conditions; and development facilitated by the General Plan <br /> Amendment and rezonings has the potential to adversely change the significance of <br /> Page 12 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.