My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 1-4; 6-9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
041613
>
18 ATTACHMENT 1-4; 6-9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 3:03:53 PM
Creation date
4/10/2013 3:42:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/16/2013
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENT 1,4,6,9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with the most updated construction SWPPP may result in the issuance of <br /> correction notices, citations, and/ or stop work orders. <br /> c. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measures, shall be included in the SWPPP and implemented as approved by <br /> the City. <br /> i. The project developer shall include erosion control/stormwater quality <br /> measures on the project grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the public storm <br /> drain system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and shall be <br /> subject to the review and approval of the City Engineer/Chief Building <br /> Official. If no grading plan is required, necessary erosion <br /> control/stormwater quality measures shall be shown on the site plan <br /> submitted for a building permit, and shall be subject to the review and <br /> approval of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and implements <br /> such measures. <br /> ii. All cut and fill slopes shall be revegetated and stabilized after completion <br /> of grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the vegetated areas are established before <br /> October 15. No grading shall occur between October 15 and April 15 <br /> unless approved erosion control/stormwater quality measures are in place, <br /> subject to the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent landscaping is <br /> place. <br /> iii. Gather all sorted construction debris on a regular basis and place them in <br /> the appropriate container for recycling to be emptied at least on a weekly <br /> basis. When appropriate, use tarps on the ground to collect fallen debris <br /> or splatters that could contribute to stormwater runoff pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked on mud and dirt from these areas before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, el:c.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> 32 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.