My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 1-4; 6-9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
041613
>
18 ATTACHMENT 1-4; 6-9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 3:03:53 PM
Creation date
4/10/2013 3:42:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/16/2013
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENT 1,4,6,9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
129. The project developer shall submit detailed landscape and irrigation plans as part <br /> of the building permit plans. The irrigation plan shall provide for automatic <br /> controls. <br /> 130. The building permit plans for this development shall contain signage and striping <br /> plans that are subject to the approval of the City Traffic Engineer. <br /> 131. All dry utilities (electric power distribution, gas distribution, communication service, <br /> Cable television, street lights and any required alarm systems) required to serve <br /> existing or new development shall be installed in conduit, underground in a joint <br /> utility trench unless otherwise specifically approved by the City Engineer. <br /> 132. The project developer shall arrange and pay for the geotechnical consultant to <br /> inspect and approve all foundation, retaining, and wall and drainage geotechnical <br /> aspects of project construction. The consultant shall be present on site during <br /> grading and excavation operations. The results of the inspections and the as-built <br /> conditions of the project shall be certified in writing by the geotechnical consultant <br /> for conformance to the approved plans and geotechnical report and submitted to <br /> the City Engineer for review and approval prior to occupancy. <br /> 133. The encroachment permit for haul route for all materials and equipment to and <br /> from this development shall be approved by the City Engineer prior to the <br /> issuance of any permit by City Building Division or Engineering Division. <br /> 134. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the project developer. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> Livermore-Pleasanton Fire Department <br /> 135. All commercial and multi-family residential occupancies shall have valve tamper <br /> and water flow connected to an Underwriters Laboratory (UL.) listed Central <br /> Station Service. Fire Department plan check includes specifications, monitoring <br /> certificate(s), installation certificate and alarm company UL certificate. <br /> 136. Fire alarm control panel and remote annunciation shall be at location(s) approved <br /> by the Fire Prevention Bureau. All systems shall be point identified by individual <br /> device and annunciated by device type and point. <br /> 137. The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 138. Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major <br /> fire. <br /> 23 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.