Laserfiche WebLink
BROOKTREE WAY ALAMEDA DR(WEST) ALAMEDA DR(EAST) Full Depth HMA/Crack Sealing <br /> ORCHARD WAY ALAMEDA DR(WEST) ALAMEDA DR(EAST) Full Depth HMA/Crack Sealing <br /> ROSETREE CT ALAMEDA DR END Full Depth HMA/Crack Sealing <br /> WINGATE DR TANGLEWOOD RD GREENWOOD RD Full Depth HMA/Crack Sealing <br /> STAPLES RANCH RD WEST LAS POSITAS END Full Depth HMA/Crack Sealing <br /> PARK PLACE VERMONT PLACE WEST LAS POSITAS Full Depth HMA/Crack Sealing <br /> BLVD <br /> VERMONT PL BOARDWALK ST STAPLES RANCH RD Full Depth HMA/Crack Sealing <br /> HARTWELL CT KIRKALDY ST END Full Depth HMNCrack Sealing <br /> HADSELL CT KIRKALDY ST END Full Depth HMA/Crack Sealing <br /> DISCUSSION <br /> This project is part of the City's preventative maintenance program and is expected to <br /> extend the life of the streets, thereby reducing long-term operation and maintenance <br /> costs. It also improves roadway surface traction and ride quality. This project has been <br /> completed to the City Engineer's satisfaction and it is recommended that City Council <br /> accept the project. <br /> There were three construction change orders and one balancing change order issued <br /> for the project resulting in a net increase of $148,806.69 to the original contract amount. <br /> The three construction change orders were issued with an aggregate total increase of <br /> $5,209.47 for the project. A balancing change order consisting of overruns and <br /> underruns in the original contract line items was also issued resulting in an increase of <br /> $143,597.22. This increase was attributed primarily to the increase in Type C HMA, 4" <br /> and 5" thick pavement repair, and crack sealing quantities. <br /> Part of the funding for this project is a Cal Recycle grant in the maximum amount of <br /> $55,483. The invoice has been submitted and staff anticipates receiving the full <br /> reimbursement amount of $55,483 from Cal Recycle. The rubberized asphalt used on <br /> this project, and paid for by the grant, diverted 2,345 used passenger tires from the <br /> landfill. <br /> The total balance remaining in the project budget to complete the 2013 street repair <br /> work is $667,910. Total project expenditures are $2,787,007 (see Attachment 1 for a <br /> Funding and Expenditure Summary). <br /> Submitt d by: Fiscal Review: Approved by: <br /> /-1---;)A/L-1 ,en.„./eriare7 <br /> Brian Dolan Emily Wagner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachment: <br /> 1. Funding and Expenditure Summary <br /> Page 4 of 4 <br />