Laserfiche WebLink
concurrently with the submittal of off-site or on-site improvement plans, (whichever <br /> comes first), the WQMP for review and approval by the City Engineer. The WQMP <br /> must be approved by a qualified engineer of the City's Engineering Division prior to <br /> the beginning of construction activities. <br /> The WQMP shall include the following BMPs along with selected BMPs to target <br /> pollutant removal: <br /> • Waste and materials storage and management BMPs (design and <br /> construction of outdoor materials storage areas and trash and waste <br /> storage areas, if any, to reduce pollutant introduction). <br /> • Spill prevention and control BMPs. <br /> • Slope protection BMPs. <br /> • Water efficient irrigation practices. <br /> • Permanent erosion and sediment controls (e.g., hydroseeding, mulching, <br /> surface covers). <br /> Projects within the Project Area will be required to comply witi the applicable <br /> provisions C3.c of MRP, including Low Impact Development (LID) source control, <br /> site design, and stormwater treatment if applicable. <br /> The WQMP shall not include infiltration BMPs unless they comply with design <br /> guidelines and requirements specified in TC-1: Infiltration Basins in the CASQA <br /> Stormwater Quality BMPs Handbook for New Development and Significant <br /> Redevelopment (2003) and/or are specifically approved by the City Engineer and <br /> shall meet MRP - NPDES Permit minimum requirements including adequate <br /> maintenance and that the vertical distance from the base of any infiltration device <br /> to the seasonal high groundwater mark shall be at least 10 feet. <br /> 21 . Water Supply. Prior to tentative map approval for the Staples Ranch Site, <br /> sufficient water supply for the Staples Ranch Site must be verified by the City of <br /> Pleasanton as described in EIR mitigation measure WS-1.1. The water supply <br /> verification must include documentation of historical water deliveries for the <br /> previous 20 years, as well as a description of reasonably foreseeable impacts of <br /> the proposed subdivision on the availability of water resources of the region. <br /> 22. EIR Mitigation Monitoring. <br /> a. If it is determined through field inspections and/or monitoring that a site is <br /> not in compliance with an EIR mitigation/improvemert measure, the <br /> responsible party for implementation of the mitigation/improvement measure <br /> is the responsible party to bring the mitigation/improvement measure into <br /> compliance. The responsible party is listed in the EIR Mitigation Monitoring <br /> and Reporting Plan. The City of Pleasanton may require the responsible <br /> party to conduct a peer review report by a consultant chosen by the City of <br /> Pleasanton to determine compliance and to recommend measures to <br /> Conditions of Approval/PUD-57 <br /> Appendix Conditions <br /> 15 <br />