e. The location of construction staging areas for materials, equipment and <br /> vehicles. <br /> f. The identification of haul routes for the movement of construction vehicles <br /> that would minimize impacts on vehicular traffic, circulation, and safety; and <br /> a provision for monitoring surface streets used for haul routes so that any <br /> damage and debris attributable to the haul tracks can be identified and <br /> corrected by the project developers. <br /> g. A process for responding to, and tracking complaints pertaining to <br /> construction activity, including identification of an on-site complaint <br /> manager. <br /> 8. Construction Dust. The project developer shall implement the following measures <br /> during all construction phases to reduce impacts associated with construction dust <br /> to the extent feasible, as determined by the City Engineer. These measures shall <br /> be incorporated into the construction documents describing procedures and <br /> specifications for contractors to follow: <br /> • Water all active construction areas at least twice daily. <br /> • Cover all trucks hauling soil, sand, and other loose materials to or from the <br /> Project Area or require all trucks to maintain at least two feet of freeboard. <br /> • Pave, apply water three times daily, or apply (non-toxic) soil stabilizers on all <br /> unpaved access roads, parking areas and staging areas at construction sites. <br /> • Sweep daily (with water sweepers) all paved access roads, parking areas and <br /> staging areas at construction sites, <br /> • Sweep streets daily (with water sweepers) if visible soil material is carried onto <br /> adjacent public streets. <br /> • Hydroseed or apply (non-toxic) soil stabilizers to inactive construction areas <br /> (previously graded areas inactive for ten days or more). <br /> • Enclose, cover, water twice daily or apply (non-toxic) soil binders to exposed <br /> stockpiles (dirt, sand, etc.). <br /> • Limit traffic speeds on unpaved roads to 15 mph. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to <br /> public roadways. <br /> • Replant vegetation in disturbed areas as quickly as possible. <br /> • Suspend excavation and grading activities to the extent feasible when <br /> instantaneous wind gusts exceed 25 mph. <br /> • Limit, to the extent feasible, the number of areas adjacent to residences subject <br /> to excavation, grading and other construction activity at any one time. <br /> 9. Underground Service Alert. Prior to initiation of any on-site construction <br /> activities, the project developer shall contact the Underground Service Alert (USA) <br /> whose purpose is to receive planned excavation reports from public and private <br /> excavators and to transmit those planned excavation reports to all participating <br /> members of USA who may have underground facilities at the location of <br /> Conditions of Approval/PUD-57 <br /> Appendix Conditions <br /> 9 <br />