My WebLink
|
Help
|
About
|
Sign Out
ORD 2008
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
3/13/2013 12:41:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/21/2010
DOCUMENT NO
ORD 2008
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(iii.) All property owners shall attach the following rider to each deed for any <br /> property within the Staples Ranch Site: <br /> Grantee hereunder acknowledges and agrees that the subject property <br /> is located in the vicinity of active and operating quarries and <br /> processing facilities. Grantee also acknowledges that quarry <br /> operations may result in airborne particulate matter, bright lights, noise <br /> and vibration, unattractive visual appearance, and heavy truck traffic <br /> on El Charro Road and adjacent streets and roadways within or <br /> outside the quarries. Grantee accepts possible inconvenience of <br /> discomfort from any of the foregoing and Grantee hereby <br /> acknowledges and agrees that no claim of nuisance shall lie based on <br /> any of the foregoing. Grantee hereby covenants to include this same <br /> paragraph, in its entirety, in any subsequent deed by Grantee of all or <br /> any portion of the subject property. Grantee further covenants to <br /> include this same paragraph within any lease for all or any portion of <br /> the subject property. <br /> 17. Photovoltaics. Prior to the issuance of a building permit, the project developer <br /> shall meet with City staff to discuss efforts to secure a grant for off-setting the cost <br /> to install photovoltaic panels on the project site. <br /> {end} <br /> Conditions of Approval/PUD-57 <br /> Project-Specific Conditions <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.