My WebLink
|
Help
|
About
|
Sign Out
ORD 2057
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
2/26/2013 12:50:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
2/5/2013
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2057
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsible Person and QSD shall be available at the project site until engineering <br /> and building permits have been signed off by the inspection departments and all <br /> work is complete. A site specific SWPPP must be combined with proper and timely <br /> installation of the BMPs, thorough and frequent inspections, maintenance, and <br /> documentation. Failure to comply with the construction SWPPP may result in the <br /> issuance of correction notices, citations or stop work orders. <br /> 2. The amendments to the SWPPP and all the inspection forms shall be completed and <br /> available at the site for inspection by the city, county or state staff. <br /> 3. The amendments to the SWPPP and all the inspection forms including but not <br /> limited to training records of training to contractors and sub-contractors, as required <br /> by Water Board, shall be completed and available at the site for inspection by the <br /> city, county or state staff. <br /> a. The applicant shall include erosion control/stormwater quality measures on the <br /> final grading plan which shall specifically address measures to prevent soil, dirt, <br /> and debris from entering the storm drain system. Such measures may include, <br /> but are not limited to, hydroseeding, hay bales, sandbags, and siltation fences <br /> and are subject to the review and approval of the City Engineer/Chief Building <br /> Official. If no grading plan is required, necessary erosion control/stormwater <br /> quality measures shall be shown on the site plan submitted for an on-site permit, <br /> subject to the review and approval of the Building and Safety Division. The <br /> applicant is responsible for ensuring that the contractor is aware of and <br /> implements such measures. <br /> b. All cut and fill slopes shall be revegetated and stabilized after completion of <br /> grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary irrigation <br /> system to ensure that the grasses are established before October 15. No <br /> grading shall occur between October 15 and April 15 unless approved erosion <br /> control/stormwater quality measures are in place, subject to the approval of City <br /> Engineer/Chief Building Official. Such measures shall be maintained until such <br /> time as permanent landscaping is place. <br /> c. Gather all sorted construction debris on a regular basis and place it in the <br /> appropriate container for recycling; to be emptied at least on a weekly basis. <br /> When appropriate, use tarps on the ground to collect fallen debris or splatters <br /> that could contribute to stormwater runoff pollution. <br /> d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access routes <br /> onto the site and place gravel on them. Do not drive vehicles and equipment off <br /> paved or graveled areas during wet weather. Broom sweep the street pavement <br /> adjoining the project site on a daily basis. Scrape caked-on mud and dirt from <br /> these areas before sweeping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.