My WebLink
|
Help
|
About
|
Sign Out
24
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
011513
>
24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2013 8:53:43 AM
Creation date
1/8/2013 11:48:15 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/15/2013
DESTRUCT DATE
15Y
DOCUMENT NO
24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering <br /> 77.The haul route for all materials to and from this development shall be approved by <br /> the City Engineer prior to the issuance of a permit. <br /> 78.AII dry utilities (electric power distribution, gas distribution, communication service, <br /> Cable television, street lights and any required alarm systems) required to serve the <br /> dwellings shall be installed underground in conduit in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer. <br /> 79.Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at fill expense to <br /> the project applicant. This shall include slurry seal, overlay, or street reconstruction <br /> if deemed warranted by the City Engineer. <br /> 80.This approval does not guarantee the availability of sufficient water and/or sewer <br /> capacity to serve the project. <br /> 81 .There shall be no direct roof leaders connected to the street gutter or storm drain <br /> system, unless otherwise approved by the City Engineer. <br /> 82.The project applicant and/or the project applicant's contractor(s) shall obtain an <br /> encroachment permit from the City Engineer prior to moving any construction <br /> equipment onto the site. <br /> 83.The project applicant shall submit a final grading and drainage plan prepared by a <br /> licensed civil engineer depicting all final grades and drainage control measures, <br /> including concrete-lined V-ditches, to protect all cut and fill slopes from surface water <br /> overflow. This plan shall be subject to the review and approval of the City Engineer <br /> prior to the issuance of a subdivision grading permit. <br /> 84.The project applicant shall include erosion control measures on the final grading <br /> plan, subject to the approval of the City Engineer. The project applicant is <br /> responsible for ensuring that the contractor is aware of such measures. All cut and <br /> fill slopes shall be revegetated and stabilized as soon as possible after completion of <br /> grading, in no case later than October 15. No grading shall occur between October <br /> 15 and April 15 unless approved erosion control measures are in place, subject to <br /> the approval of the City Engineer. Such measures shall be maintained until such <br /> time as a permanent landscaping is in place. <br /> 85.AII retaining walls along the street shall be placed behind the Public Service <br /> Easement (PSE), unless otherwise approved by the City Engineer. <br /> 86.AII existing septic tanks or holding tanks shall be properly abandoned, pursuant to <br /> the requirements of the Alameda County Department of Health Services prior to the <br /> start of grading operations, unless specifically approved by the City Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.