My WebLink
|
Help
|
About
|
Sign Out
24
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
011513
>
24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2013 8:53:43 AM
Creation date
1/8/2013 11:48:15 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/15/2013
DESTRUCT DATE
15Y
DOCUMENT NO
24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Roof drains shall discharge and drain away from the building foundation. <br /> Ten percent of the stormwater flow shall drain to landscaped area or to an <br /> unpaved area wherever practicable. <br /> B. Construction Requirements <br /> The Construction General Permit's construction requirements include, but are not <br /> limited to, the following: <br /> Construction activities (including other land-disturbing activities) that disturb one <br /> acre or more (including smaller sites that are part of a larger common plan of <br /> development) are regulated under the NPDES stormwater program. Operators of <br /> regulated construction sites are required to develop and implement stormwater <br /> pollution prevention plans and to obtain a construction general permit (NOI) from the <br /> State Water Resources Control Board to discharge stormwater. <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/dots/finalc <br /> onstpermit.pdf <br /> 1. The project developer shall submit a Stormwater Pollution Prevention Plan <br /> (SWPP) for review by the City Engineer/Chief Building Official prior to issuance <br /> of building or engineering permits. A reviewed copy of the SWPPP shall be <br /> available at the project site until engineering and building permits have been <br /> signed off by the inspection departments and all work is complete. A site specific <br /> SWPPP must be combined with proper and timely installation of the BMPs, <br /> thorough and frequent inspections, maintenance, and documentation. Failure to <br /> comply with the reviewed construction SWPPP may result in the issuance of <br /> correction notices, citations or stop work orders. <br /> 2. The amendments to the SWPPP and all the inspection forms shall be completed <br /> and available at the site for inspection by the city, county or state staff. <br /> 3. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measure, shall be included in the SWPPP and implemented as approved by the <br /> City. <br /> a. The project developer shall include erosion control/stormwater quality <br /> measures on the final grading plan which shall specifically address measures <br /> to prevent soil, dirt, and debris from entering the storm drain system. Such <br /> measures may include, but are not limited to, hydroseeding, hay bales, <br /> sandbags, and siltation fences and are subject to the review and approval of <br /> the City Engineer/Chief Building Official. If no grading plan is required, <br /> necessary erosion control/stormwater quality measures shall be shown on the <br /> site plan submitted for an on-site permit, subject to the review and approval of <br />
The URL can be used to link to this page
Your browser does not support the video tag.