Laserfiche WebLink
approved erosion control/storm water quality measures are in place, subject to the <br />approval of the City Engineer/Director of Building Safety. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br /> <br />115. <br /> <br />The project developer shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. These BMP's shall be implemented by the general contractor and <br />all subcontractors and suppliers of materials and equipment. Construction site cleanup <br />and control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />116. The project developer is responsible for implementing the following measures during all <br /> construction phases of the project: <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to <br />storm water runoff pollution. <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street pavement adjoining <br />the project site on a daily basis. Scrape caked-on mud and dirt from these areas <br />belbre sweeping. <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to <br />ensure effectiveness and to prevent street flooding. <br /> <br />Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />Bulk construction materials stored outdoors that may contribute to the pollution of <br />storm water runoff shall be covered as required by the City Engineer and/or the <br />Director of Building Inspection. <br /> <br />Final Conditions (Corrected) March 4, 2003 Page 21 of 22 <br /> <br /> <br />