My WebLink
|
Help
|
About
|
Sign Out
RES 03082
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2003
>
RES 03082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2003 8:40:18 AM
Creation date
7/7/2003 8:34:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2003
DOCUMENT NO
RES 03082
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grants <br /> <br />This year's program includes the following two grants: <br /> <br />· 2003-04 Prop 40 (Park improvements) <br />· 2003-04/2005-06 Assembly Bill 2928 (Street projects) <br /> <br />$470,260 <br />$150,000 annually <br /> <br />Utility User's Fees <br /> <br />The City has adjusted sewer and water rates in part to establish a rate component for Sewer and Water <br />Replacement and Improvement Projects. To reflect the establishment of the Sewer and Water <br />Replacement Funds, the water and sewer program is divided into expansion and replacement/ <br />improvement projects. Expansion projects are those funded by connection fees while replacement and <br />improvement projects are funded by utility user fees that are transferred from the water and sewer <br />maintenance and operation fund. The funds are not transferable between each other. All of the fund <br />detail is included in Section I of the Appendix. Revenue from the water and sewer maintenance and <br />operation fund is as follows: <br /> <br />SUMMARY OF UTILITY USER FEES INCLUDED IN THE CIP <br /> <br /> FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 TOTAL <br />SEWER $1,427.637 $1.524.605 $1.633,195 $3,285.652 $7.871.089 <br />WATER $2.535,287 $2,517.862 $2.516A58 $2,521.279 $10.090.586 <br />TOTAL $3.962,924 $4.042.467 $4,149.353 $5.806.931 $17.961,675 <br /> <br />Transfers from the General Fund <br /> <br />This program includes a transfer of approximately $7,100,000 from the General Fund for 2003-04 and <br />$5,800,000 in 2004-05. A total transfer of $27,500,000 is estimated for all four years of the program. <br />The transfer of $12.9 million for the first two years is equivalent to amount planned in the 2002-03 CIP. <br />However, to reflect the need for funding to be available for the renovation of the Veterans Memorial <br />Building, staff has increased the transfer in 2003-04 from the $6,100,000 projected to $7.1 million. <br />Conversely, to remain consistent with long term planning for the General Fund, the amount of transfer in <br />2004-05 has been reduced. As indicated, these transfers do not affect the total General Fund transfers <br />projected previously. Nevertheless, City staff will continue to monitor the need to reduce or increase <br />these transfers to address current CIP and operating needs. <br /> <br />As indicated in the financial tables included in the Section 1 Appendix of the General Fund revenues <br />will be used to pay for all or a portion of a variety of projects in the Streets, Parks and Miscellaneous <br />project categories including, annual street resurfacing, the Bemal Park Reserve, the Expansion of Sutter <br />Gate Park, Downtown Parking Improvements, Bemal Property Improvements Reserve, City Hall Office <br />Building and Civic Center Site Improvements Reserve, Debt services, the Veterans Memorial Building <br />Renovation, etc. With many of these projects, the General Fund is used to meet the City's required <br />contribution to projects funded with Public Facility Fees. A distribution of General Fund contributions <br />over the five years of the program is as follows on the next page: <br /> <br />XV <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.