Laserfiche WebLink
Initial Infrastructure Capital Fees <br /> The City and other public entities (e.g.,Pleasanton Unified School District, Zone 7, <br /> DSRSD,etc.) receive capital facility fees (Development Fees)at the time a City building <br /> permit is issued for all housing units developed in the City. The City's Development <br /> Fees, the Tri-Valley Traffic Fee and DSRSD's Connection Fees are generally charged <br /> based on the type of unit (e.g.multi-family or single family),regardless of the square <br /> footage of the unit. Zone 7's water connection fee is based on the diameter of the water <br /> meter,which is uniform for most housing units; however their Drainage Fee is based on <br /> the amount of impervious surface, which varies with house and lot size. The Pleasanton <br /> Unified School District's fee is based on the square footage of a home, up to a 7,000 s.f. <br /> maximum. Table 5 presents the assumptions regarding these fees based on each housing <br /> type: <br /> Table 5 <br /> Develo•ment Fees B T • of Housin, Unit <br /> Multifamily Single Family Hillside Homes <br /> City's Feet <br /> Public Facilities Fees $ 2,413.00 $ 3,957.00 $ 3,957.00 <br /> Water Connection Fees $ 640.00 $ 1,200.00 $ 1,200.00 <br /> Sewer Connection Fees $ 330.00 $ 500.00 $ 500.00 <br /> Park Dedication Fees $ 7,969.00 $ 9,707.00 $ 9,707.00 <br /> ( Traffic Impact Fees $ 2,756.00 $ 3,938.00 $ 3,938.00 <br /> Lower Income Housing Fee $ 2.405.00 $ 9.702.00 $ 9.702.0Q <br /> Total City Fees $ 16.513.0Q $ 29.004.0Q $ 29.004.0Q <br /> Other Aaencieg <br /> Zone 7(Water) $ 21,821.00 $ 20,270.00 $ 20,270.00 <br /> DSRSD (including <br /> LAVWMA) $ 7,681.00 $ 13,000.00 $ 13,000.00 <br /> TnValley Traffi Fees $ 1,292.00 $ 2,032.00 $ 2,032.00 <br /> Pleasanton Unified School <br /> District $ 2,736.00 $ 30,170.00 $ 60,340.00 <br /> Zone 7 Drainaget't $ 725.00 3 2,815.00 $ 6.835,00 <br /> Total Other Agencies $ 34.055.0Q $ 68.287.00 $ 102.477.00 <br /> Total Capital Fees $ 50,568.00 $ 97,291.00 $ 131,481.00 <br /> 1 Assumed im.ervious surface is -•ual to the floor area •lus 10%. <br /> 31 <br />