My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
112012
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 12:54:58 PM
Creation date
11/16/2012 12:54:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/20/2012
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 8 <br /> �{ - CITY COUNCIL AGENDA REPORT jV( <br /> PL£ASANTON. <br /> November 20, 2012 <br /> Community Development <br /> Engineering Division <br /> TITLE: APPROVE PLANS AND SPECIFICATIONS, REVIEW BIDS AND AWARD <br /> CONTRACT TO JFC CONSTRUCTION, INC. IN THE AMOUNT OF <br /> $342,607 FOR THE SPORTS PARK CONCESSION STAND #3 AND <br /> BATHROOMS REPLACEMENT PROJECT, CIP NO. 127034. <br /> SUMMARY <br /> Bids have been received for the project to replace the existing concession stand #3 and <br /> attached bathrooms at the City of Pleasanton's Sports Park Facility. Staff is <br /> recommending award of the construction contract to the lowest responsible bidder, JFC <br /> Construction, Inc., in the amount of $342,607. The project consists of removing the <br /> existing building and surrounding sidewalk and replacing them with a prefabricated <br /> masonry building, new sidewalk, and connecting to the existing utilities. <br /> RECOMMENDATION <br /> 1. Approve plans and specifications for this project. <br /> 2. Review the bids and award the contract for the project to JFC Construction, Inc., of <br /> Martinez, California, for a low bid amount of$342,607. <br /> 3. Authorize the City Manager to enter into the project contract. <br /> 4. Authorize the Director of Community Development to approve and execute any <br /> required contract change orders to address unanticipated project conditions for a <br /> not-to-exceed amount of$34,993 (approximately 10% of the contract). <br /> 5. Appropriate $377,800 from the Facilities Renovation Fund and budget the funds in a <br /> new project, Sports Park Concession Stand #3 and Bathrooms Replacement project, <br /> CIP No. 127034, for tracking purposes. <br /> FINANCIAL STATEMENT <br /> Funding for this project will be provided by the Facilities Renovation Fund (043900). <br /> The new building is designed to last 50 years and utilizes new energy efficient lighting <br /> fixtures and low flow water fixtures, reducing the overall cost of operation and <br /> maintenance. A summary of funding and estimated expenditures is presented in <br /> Attachment 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.