Laserfiche WebLink
Mr. Stephen Kirkpatrick P.E. <br /> The City of Pleasanton <br /> October 17, 2012 <br /> Page 3 <br /> Task 3— Conduct Hydraulic Analysis: <br /> Carollo will utilize the converted hydraulic model to analyze the hydraulic conditions in the EATS <br /> and EARS systems. The analysis will determine the amount of flow that can be routed from the <br /> EATS pipeline to the EARS pipeline, and if there are hydraulic constraints that limit the amount <br /> of flow the EARS system can accept flow from EATS. The model will also be used to review the <br /> implications of installing the EARS PS with a firm capacity of 2 mgd. <br /> Carollo will evaluate impacts to existing equipment of the EALS and EARS collection system <br /> infrastructure from the modified operation. Carollo will evaluate how the system will operate <br /> during peak wet weather flow; including, an analysis to determine what volume/flows the EARS <br /> system begins backing up and how wet weather(i.e. excess)flow can be diverted from the <br /> EARS to the EATS. <br /> The City has identified possible cross connections between the EATS and EARS collection <br /> systems and the mini basins associated with the cross connections. Carollo will evaluate the <br /> existing cross-connection points and determine if additional cross-connections are necessary. <br /> Task 4—East Amador Pump Station Site Constraints: <br /> Carollo will estimate the footprint of a 2 mgd pump station and support facilities. Carollo will also <br /> review the available site size for the EARS PS and determine if the site size will constrain the <br /> capacity of the pump station. <br /> Task 5— Documentation Hydraulic Analysis Findings and Recommendations: <br /> Carollo will attend one meeting with the City to discuss the model update, findings of the <br /> hydraulic analysis and finding of the site constraints review. Carollo will also develop a technical <br /> memorandum (TM) summarizing the findings and the recommendations. Carollc will submit an <br /> electronic copy of the TM to the City for review prior to the meeting. <br /> SCHEDULE <br /> Consultant will complete the services within 60 days of the notice to proceed from the City. <br /> PAYMENT <br /> Payment to the Consultant for this work shall be on an hourly basis in accordance with the <br /> attached fee schedule (Attachment A) and budget estimate (Attachment B)with a not to exceed <br /> limit of$38,0000 without prior written agreement. <br /> pw/Cardlo/Document9gienVCNPleasanton/-Proposals/EARS Pump StefionNODUEARS Scope Letter(B) carollo.com <br />