My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
112012
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 12:46:35 PM
Creation date
11/16/2012 12:46:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/20/2012
DESTRUCT DATE
15Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED PROJECT SCHEDULE AND BUDGET <br /> Project Schedule <br /> Figure 1 on the following page illustrates EPS's expectations for completion of the various tasks <br /> included in this Proposed Scope of Services. As shown, EPS anticipates that the technical work <br /> for this study can be completed within 120 days, as suggested by the City's Request for <br /> Proposals. The Task 1 technical analysis can be complete within three (3) weeks of the project <br /> initiation meeting, with the targeted stakeholder meeting to be conducted shortly thereafter. <br /> Following confirmation of the preferred methodology, the technical analysis under Tasks 2.1 <br /> through 2.3 can be completed within an additional six (6) weeks. Following City staff review of <br /> the technical analysis, EPS will conduct Tasks 2.4 through 2.6 within an additional four(4) <br /> weeks. This schedule would still allow roughly one month in which to conduc:public hearings on <br /> the materials and still be complete within 120 days; however, EPS is aware that public meeting <br /> schedules and agendas may be difficult to confirm this far in advance. <br /> Project Budget <br /> As shown on Table 1, EPS anticipates that this project will require a budget not-to-exceed <br /> $50,000, or $42,510 if the City elects not to conduct optional Task 2.4. This figure includes all <br /> consultant services, as well as minor direct costs for reproduction and travel. EPS provides <br /> monthly invoices for work performed, and anticipates payment within thirty (30) days if possible. <br /> I. <br /> Economic&Planning Systems, Inc. 9 nnpw,nsno-unnonsuzui sneasammgla lisp:4_0917224n( <br />
The URL can be used to link to this page
Your browser does not support the video tag.