My WebLink
|
Help
|
About
|
Sign Out
ORD 2050
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
9/28/2012 11:39:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/4/2012
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2050
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reasonably suspected to overlie adjacent remains until the County coroner has <br /> determined, in accordance with any law concerning investigation of the circumstances, the <br /> manner and cause of death and has made recommendations concerning treatment and <br /> dispositions of the human remains to the person responsible for the excavation, or to <br /> his/her authorized representative. A similar note shall appear on the construction plans. <br /> 29. The project developer shall prepare a Construction Best Management Plan before <br /> issuance of the building permit and shall include, but is not limited to, the following: <br /> a) All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall occur between the hours of <br /> 7:00 a.m. to 6:00 p.m., Monday through Friday and between the hours of 8:00 a.m. <br /> to 5:00 p.m. on Saturday. Construction activities taking place within the completely <br /> enclosed kiosk structure shall be limited to the hours of 7:00 a.m. to 8:00 p.m. <br /> Monday through Saturday only. <br /> b) No construction shall be allowed on State or Federal Holidays or Sundays. The <br /> Director of Community Development may allow earlier construction "start times" for <br /> specific construction activities (e.g., concrete foundation/slab pours) if it can be <br /> demonstrated to the satisfaction of the Director of Community Development that <br /> the construction and construction traffic noise will not affect nearby residents. <br /> c) A construction staging plan shall be designated for all materials, equipment, and <br /> vehicles including parking for construction works and personnel. <br /> d) A construction truck route shall be designated to keep all construction traffic away <br /> from nearby residential streets. Prior to construction, the construction traffic route, <br /> construction hours, and contact names and telephone numbers shall be posted on <br /> the driveway entrances, throughout the construction site, and in any construction <br /> trailer(s). <br /> e) Comprehensive traffic control measures shall be implemented, including <br /> scheduling of major truck trips and deliveries, to avoid peak travel hours. If <br /> necessary, as determined by the Traffic Engineer, proper lane closure procedures <br /> such as flagger stations, signage, cones, and other warning devices shall be <br /> implemented during construction. <br /> f) The haul route for all materials to and from this development shall be from Bernal <br /> Avenue, shall be approved by the City Engineer prior to the issuance of an <br /> encroachment permit, and shall include the provision to monitor the street surfaces <br /> used for the haul route so that any damage and debris attributable to the haul <br /> trucks is identified and corrected at the expense of the project applicant or <br /> developer. <br /> g) All internal combustion engines on grading or construction equipment used shall <br /> be equipped with a muffler equal to or better than that supplied by the vehicle <br /> manufacturer. All equipment shall be maintained in good mechanical condition so <br /> as to minimize noise and air pollution from faulty engine, drive train, and other <br /> components. No muffler or exhaust system shall be equipped with cutout, bypass, <br /> or similar device intended to thwart quieting. <br /> h) Dust control best management practices, as approved by the City Engineer, shall <br /> be followed at all times during grading and construction operations. Such <br /> measures may include watering of exposed surfaces twice a day, and more <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.