Laserfiche WebLink
taken to comply with this Ordinance and help prevent Deposit in Landfill(s) of <br /> Covered Materials from Self Haulers. Previously approved Compliance Plans <br /> under Authority Ordinance 2008-01 may be amended to address the requirements <br /> of this Section. <br /> (c) The Compliance Plan shall include the following: <br /> (1) Methods for discouraging Covered Materials from Self Haulers from <br /> being Deposited in Landfills. <br /> (2) Methods for assisting the Authority in identifying Waste Generators that <br /> violate this Ordinance, including recording practices to be followed when <br /> noncompliance is observed. <br /> (3) Procedures for complying with the requirements of Section 7(a) of this <br /> Ordinance, including posted pricelists. <br /> (4) Load checking programs to prevent the acceptance of Covered Materials <br /> from Self Haulers. This program shall at a minimum provide for: <br /> (1) the number of random load checks to be performed; <br /> (2) recording of load checks; and <br /> (3) training of personnel in the recognition, proper handling, and <br /> disposition of Covered Material. <br /> (5) Description of efforts the facility will take to install informative signage <br /> regarding the Covered Material ban at facility entrances and at waste <br /> receiving areas. The signage shall consist of permanent visible signs, <br /> prominently displayed, clearly indicating that Covered Material is <br /> prohibited from being Deposited in Landfills or delivered such that it will <br /> be Deposited in Landfills. These signs shall be in place within 30 days of <br /> approval of the Compliance Plan. <br /> (6) Description of employee training efforts to comply with this Ordinance. <br /> (7) Additional information reasonably requested by the Authority as necessary <br /> to determine compliance with the Ordinance and how best to achieve <br /> compliance with the Ordinance. <br /> (8) Identification of any impediments to and suggestions relating to the <br /> ongoing implementation of this Ordinance. <br /> (d) Every owner or Operator of a Landfill or Transfer Station in Alameda County <br /> shall submit its proposed Compliance Plan to the Enforcement Official no later <br /> than 60 days after adoption of this Ordinance. <br /> 8 <br />