Laserfiche WebLink
•wl.wi••, .c . ,..f _ ..n' ' <br /> • w- M 4 <br /> . . A r—" ' 4 ; <br /> 1, '•p - ' <br /> Offices ,,, ` ;j}- <br /> I .'-F' L, <br /> I F4 .. • p c f 4 - D F <br /> w- p <br /> .t '- r•• <br /> . aq.0 ps 't `�T.� <br /> Residential k '" <br /> Dwellings -J �,. .,:6 f <br /> Project a, <br /> r Site t ' r <br /> �; Manufacturing sL ,''• , <br /> z <br /> .a • <br /> IP i <br /> .I . Cl. <br /> I Offices „ <br /> -41 t' 1 i; <br /> .r ti T 11 '""'-r""tea: Ay' - \.. <br /> Figure 1: Project Site and Surrounding Location <br /> Valley Business Park has a mix of uses that include, but are not limited to; professional <br /> offices, light manufacturing and industrial uses, and other uses, such as religious <br /> facilities, private schools, and cheerleader training and other sports and recreational <br /> facilities. <br /> As shown on Figure 1, above, the Tri-Valley Chinese Bible Church is surrounded by <br /> office and industrial uses to the north, east and south. A residential development is <br /> located to the west of the project site. This development is separated from the project <br /> site by a 30-foot wide landscaped easement and a 10-foot high concrete block wall. <br /> PROJECT DESCRIPTION <br /> The Tri-Valley Chinese Bible Church has requested approval of a Planned Unit <br /> Development Modification to allow State-registered Heritage Schools to operate in the <br /> Valley Business Park with an approved Conditional Use Permit. <br /> The Tri-Valley Bible Church has also requested approval to operate a State-registered <br /> Heritage School within their existing church facility. The school will occupy 2,692 square <br /> feet, including five existing classrooms and the fellowship hall. No exterior modifications <br /> are proposed. The school will operate during the school year and will provide after <br /> school care for children in Kindergarten through grades 5. Although the project <br /> description reviewed by the Planning Commission included a tentative summer camp, <br /> the applicant now wishes to eliminate consideration of the summer program. <br /> Please refer to the attached Planning Commission staff report (Attachment 5), dated <br /> August 22, 2012, and the written statement (Attachment 3) for additional project <br /> information. <br /> Page 4 of 6 <br />