Laserfiche WebLink
MOM IMMO <br />—e I■ <br />MINIMMIlir <br />Carlson, Barbee Exhibit "B" <br />& Gibson, Inc. <br />CIVIL ENGINEERS • SURVEYORS • PLANNERS <br />ENGINEER'S PRELIMINARY BOND ESTIMATE <br />19 SINGLE FAMILY LOTS <br />THE RESERVE AT PLEASANTON <br />PLEASANTON, CA <br />Item Description <br />Unit <br />Quantity Unit Price <br />July 13, 2012 <br />Job No.: 1014 -91 <br />Amount <br />FROG HILL LANE EXTENSION - UTILITIES FOR ROBERT'S PROPERTY <br />1 Sanitary Sewer Manholes 4 EA $ 3,500.00 $ 14,000.00 <br />2 8" PVC Sanitary Sewer Pipe 205 LF $ 35.00 $ 7,175.00 <br />3 8" PVC Water Line 215 LF $ 40.00 $ 8,600.00 <br />4 Temporary Blowoff 1 EA $ 1,230.00 $ 1,230.00 <br />5 8" Water Line Elbow Fittings 5 EA $ 400.00 $ 2,000.00 <br />Subtotal Utilities $ 33,005.00 <br />SUBTOTAL CONSTRUCTION COST $ 33,005.00 <br />15% CONTINGENCY $ 4,950.75 <br />TOTAL CONSTRUCTION COST $ 38,000.00 <br />Notes: <br />1. The cost of potholing existing utilities in Old Vineyard Avenue is not inluded in this estimate. <br />6111 BOLLINGER CANYON ROAD, SUITE 150 • SAN RAMON, CALIFORNIA 94583 • (925) 866 -0322 • FAX (925) 866 -8575 • www.cbandg.com <br />P: \1000 - 1099\101491 \EsIirnetes∎Bond \Est -002 - 201101 12_roberts extension.xls <br />