My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
061912
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:36:11 PM
Creation date
6/13/2012 4:36:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/19/2012
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The Annual Sidewalk and Intersection Ramp Installation project is an annual City <br /> program. The intent of the project is to perform the necessary repairs and improvements <br /> to the existing walkways and American with Disabilities Act (ADA) access ramps for <br /> pedestrian accessibility. Curb and gutter with drainage problems near the project area <br /> was also repaired as part of this project. <br /> On August 16, 2011, Pleasanton's City Council awarded the contract to the lowest <br /> responsible bidder, AJW Construction, in the amount of $101,440. Council authorized <br /> the Director of Community Development to approve change orders up to the project <br /> contingency amount of$20,288. The project has since been completed and is ready for <br /> acceptance. <br /> Budget <br /> Funding for the project was provided by the Annual Sidewalk and Intersection Ramp <br /> Installation Project, CIP 105005. Change orders totaling $17,453.25 included additional <br /> work requested by the Operations Services Department, and a credit in the amount of <br /> $142 from the contractor for a road sign that was damaged by the contractor during <br /> construction. The City furnished the sign to the contractor to replace. A summary of the <br /> project's funding sources and expenditures is presented in Attachment 1. <br /> Submitte by: Fiscal Review: Approve y: <br /> rian Doan Emily Wagner ' p / Nelson Fialho <br /> Director of Director of Financeā" City Manager <br /> Community Development <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.