My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
060512
>
14 ATTACHMENT 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2012 12:22:58 PM
Creation date
5/31/2012 12:22:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/5/2012
DESTRUCT DATE
15Y
DOCUMENT NO
14 ATTACHMENT 02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■PLEASANTON TOD STANDARDS AND GUIDELINES: BART PROPERTY <br /> Note to reader: <br /> These draft TOD Guidelines apply only to the San Francisco Bay Area Rapid Transit District (BART) owned <br /> property (the "BART Property") within the City of Pleasanton, located at the Dublin/Pleasanton BART <br /> Station adjacent to the Hacienda Business Park ("Hacienda"). Following adoption by the City, the intent <br /> is to incorporate these standards and guidelines into the already adopted Hacienda TOD Standards and <br /> Design Guidelines which apply to other parcels within the half-mile distance from the BART station. We <br /> have included the Purpose,Vision Statement, and TOD Framework sections from the adopted Hacienda <br /> TOD document so there is context to evaluate the proposed BART property guidelines. <br /> We have applied a similar approach to the BART property as was used for the other TOD sites—creating <br /> a circulation, access and open space framework combined with a range of feasible building options to <br /> provide guidance for future TOD development.The street character, density and mix of buildings types <br /> follows the direction identified by Planning Commission and Council that this location adjacent to the <br /> BART station warrants a higher intensity of office, residential, hotel and retail uses, and assumes that <br /> structured parking will be necessary to support those activities, even with a higher percentage of transit <br /> ridership for those tenants. <br /> There is a desire to maintain the existing BART commuter parking spaces. In the event the BART line is <br /> extended to the east toward Livermore, the proposed parking strategy can accommodate fewer transit <br /> commuters from the Livermore and the Central Valley and support the needs of nearby residents, <br /> workers and local shoppers as part of a parking district. Given the large size of the parcel,we have <br /> shown various structured parking options that reinforce the TOD Village character and a phased <br /> development approach that can respond to shifting market demand, rents and cost parameters over <br /> time. <br /> June 17, 2011 2 WORKSHOP DRAFT <br />
The URL can be used to link to this page
Your browser does not support the video tag.