Laserfiche WebLink
BACKGROUND <br /> The Housing Element adopted on February 13, 2012, includes Program 9.7 requiring <br /> the preparation of development standards and design guidelines to guide development <br /> on the nine sites recently rezoned for multifamily development. Staff and the TOD <br /> consultant architect prepared the draft standards and design guidelines in Attachment 1 <br /> drawing from the Hacienda TOD Development Standards and Design Guidelines. <br /> The Draft TOD Standards and Guidelines for the BART property were prepared <br /> following the work of the Hacienda Task Force. On several occasions during the Task <br /> Force deliberations questions had been asked regarding future development on the <br /> BART site and how it would interface with development on the south side of Owens <br /> Drive and the planned street and Iron Horse Trail improvements. Following the <br /> completion of the Task Force's work the City worked with the TOD consultant team, <br /> BART, and East Bay Regional Park District's staff, to prepare the draft standards and <br /> design guidelines, as shown in Attachment 2. <br /> HOUSING SITE DEVELOPMENT STANDARDS AND DESIGN GUIDELINES <br /> The Draft Housing Site Development Standards and Design Guidelines are similar to <br /> the ones prepared for the Hacienda TOD sites in that they include a similar vision and <br /> cover many of the same topics as the previous multifamily standards and guidelines. <br /> The development standards (related to housing affordability, mix of affordable units, <br /> setback and yard minimums, open space requirements) are largely the same as in the <br /> Hacienda TOD document. Parking for the TOD housing sites (Site 1, BART; Site 2, <br /> Sheraton Hotel; Site 3:Stoneridge Shopping Center; and Site 8: CarrAmerica) are the <br /> same as the Hacienda TOD standards (i.e. a 25 percent reduction compared to the <br /> Municipal Code requirements); other sites would use the off-street parking requirements <br /> in the Municipal Code unless there is justification to reduce that. Additional information <br /> in this document includes diagrams illustrating site layout for different size sites, and an <br /> Appendix providing details and development considerations for each of the nine sites <br /> that were rezoned. <br /> TOD STANDARDS AND GUIDELINES FOR THE BART PROPERTY <br /> Standards and Guidelines for the BART property include a Vision Statement and a TOD <br /> Framework discussion similar to the one in the Hacienda TOD. Required improvement <br /> on Owens Drive between Willow and the Iron Horse Trail are similar to those required <br /> on the south side of the street with the BRE development. Given the importance of auto, <br /> bus, taxi, pedestrian, and bike access to the site, the document includes details on <br /> circulation strategies for each mode, as well as various parking scenarios. In order to <br /> provide for some flexibility in development of the site, several different development <br /> scenarios are illustrated including office, residential, hotel and mixed use development. <br /> The document outlines the PUD process which will be used to review proposals on the <br /> BART site and provides FAR maximums (with and without trip reduction, 1.0 and 1.3, <br /> respectively), minimum and maximum residential densities (45 to 47 units per acre), <br /> group usable open space (200 square feet per dwelling unit), a maximum height of 85 <br /> feet, and TOD parking minimums. A minimum of 10,000 square feet of retail space <br /> Page 2 of 3 <br />