Laserfiche WebLink
Invitation to Bid on "As Needed Services" <br /> Parks Landscape- Section 1, Landscape Construction Services, Unit Costs <br /> Unit of <br /> Measure Item Description Unit Cost <br /> Each Supply, plant, and stake one, 24-inch size box tree $ <br /> Each Supply,plant, and stake one, 15-gallon size tree $ <br /> Each Supply, plant and stake one, 5-gallon size tree $ <br /> Each Supply and plant one, 4-inch size plant $ <br /> Each Supply and plant one flat of groundcover $ <br /> Each Supply and plant one, 1-gallon size plant $ <br /> Each Supply and plant one, 5-gallon size plant $ <br /> Each Supply and install one turf rotor sprinkler, (Hunter 1-25) $ <br /> Supply and install one 6-inch pop-up sprinkler (Toro 570 <br /> Each or Hunter Institutional) $ <br /> Supply and install one, 3/4-inch remote control valve <br /> Each (Griswold 2000) $ <br /> Supply and install one, l-inch remote control valve <br /> Each (Griswold 2000) $ <br /> Supply and install one, 1.5-inch remote control valve <br /> Each (Griswold 2000) $ <br /> Supply and install one, 2-inch remote control valve <br /> Each (Griswold 2000) $ <br /> Supply and install one, 2.5-inch remote control valve <br /> Each (Griswold 2000) $ <br /> One Hour Hourly rate for construction laborer, including tools $ <br /> One Hour Hourly rate for light carpentry work, including tools $ <br /> One Yard Supply and install one yard of wood chip mulch $ <br /> Supply and install one I.5-inch irrigation backflow (825Y <br /> Each Febco) $ <br /> One Hour Hourly Rate for Concrete Finisher, including tools $ <br /> 13 <br />