Laserfiche WebLink
BACKGROUND <br /> The approximately 1,000-acre Plan Area (see Attachment 1) is located generally east of <br /> Valley Avenue and Busch Road and north of Stanley Boulevard. Approximately 320 <br /> acres are owned by Legacy Partners and 50 acres are owned by the Kiewit <br /> Corporation. Most of the remaining land is owned by the Zone 7 Water Agency (Lake I <br /> and Cope Lake) and by Pleasanton Gravel Company (Lake H, 108 acres). These lakes <br /> were created by quarrying activities during the past century. Existing land uses within <br /> the Plan Area consist of the Pleasanton Garbage Service Transfer Station and <br /> Recycling Center, the City's Operations Service Center, some remaining storage of <br /> materials on the Kiewit site, three former quarry lakes, and vacant land. <br /> In order to accommodate new development and provide detailed planning guidance in <br /> East Pleasanton, the Pleasanton General Plan specifies that the City will initiate a <br /> specific plan process for the portion of East Pleasanton as illustrated in Attachment 1. <br /> The proposed Specific Plan area encompasses land where gravel mining operations <br /> have ceased, and remediation is completed, as well as the City's Operations Service <br /> Center and Pleasanton Garbage Services facilities. The latter two properties are <br /> included in order to evaluate their optimum location in this area. <br /> The General Plan Land Use Map indicates this site as a future specific plan area and <br /> shows the following land use designations for the site for evaluation: High Density <br /> Residential; Retail/Highway/Service Commercial, Business and Professional Offices; <br /> General and Limited Industrial; Business Park; Public and Institutional; and Parks and <br /> Recreation. In addition, El Charro Road is shown by the General Plan to be extended <br /> south through the middle of the site, connecting 1-580 with Stanley Boulevard. <br /> The General Plan states that this area may include development of residential, <br /> commercial, and office/industrial uses; and that the lakes be used for flood protection, <br /> groundwater recharge, habitat and recreational purposes. In addition, the Specific Plan <br /> is intended to: (1) define a vehicular and pedestrian circulation system for the area, <br /> including improvements to El Charro Road; (2) plan for the extension of public utilities; <br /> and (3) create a funding mechanism for the infrastructure required to support this <br /> development. <br /> The Pleasanton Urban Growth Boundary (UGB) line presently bisects the Plan Area in a <br /> north/south direction along the proposed El Charro Road extension alignment. The <br /> Pleasanton General Plan recognizes that future planning for the Specific Plan Area may <br /> necessitate a modification to the UGB line and thus specifies that the City should: <br /> "Reevaluate the Urban Growth Boundary locations in East Pleasanton at such <br /> time as comprehensive land use designation changes are considered for the <br /> reclaimed quarry lands." <br /> The proposed Specific Plan Area is situated completely within Pleasanton's Sphere-of <br /> Influence. <br /> Page 2 of 7 <br />