My WebLink
|
Help
|
About
|
Sign Out
ORD 2035
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
5/7/2012 3:20:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
5/1/2012
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2035
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be shown on the plans submitted to the Building and Safety Division for plan check to the <br /> satisfaction of the City Traffic Engineer and shall be subject to the review and approval of the City <br /> Traffic Engineer prior to building permit issuance. <br /> 80. The applicant and/or project developer shall modify the westbound intersection approach striping <br /> on Gibraltar Drive (east of Hacienda Drive) to facilitate a single westbound travel lane. This <br /> improvement shall be shown on the plans submitted to the Building and Safety Division for plan <br /> check to the satisfaction of the City Traffic Engineer and shall be subject to the review and <br /> approval of the City Traffic Engineer prior to building permit issuance. <br /> 81. The applicant/project developer shall modify the eastbound intersection approach striping on <br /> Gibraltar Drive (west of Willow Road) to facilitate single eastbound travel lane. This improvement <br /> shall be shown on the plans submitted to the Building and Safety Division for plan check to the <br /> satisfaction of the City Traffic Engineer and shall be subject to the review and approval of the City <br /> Traffic Engineer prior to building permit issuance. <br /> 82. The applicant and/or project developer shall install all signage, pavement striping, and traffic signal <br /> equipment needed to change Owens Drive (eastbound), Willow Road, and Gibraltar Drive from its <br /> current design to the reduced lane geometry. This includes all vehicular, bicycle, and pedestrian <br /> signage necessary. These improvements and plan notes shall be shown on the plans submitted <br /> to the Building and Safety Division for plan check to the satisfaction of the City Traffic Engineer <br /> and shall be subject to the review and approval of the City Traffic Engineer prior to building permit <br /> issuance. <br /> 83. The applicant and/or project developer shall bring all pedestrian ramps up to current American with <br /> Disability Act (ADA) standards. This includes all ramps at Owens Drive at Willow Road, Willow <br /> Road at Gibraltar Drive, and Gibraltar Drive at Hacienda Drive as well as ramps adjacent to the <br /> project sites (i.e., Sites 1 and 2). These improvements and plan notes shall be shown on the plans <br /> submitted to the Building and Safety Division for plan check to the satisfaction of the City Engineer <br /> and City Traffic Engineer and shall be subject to the review and approval of the City Engineer prior <br /> to building permit issuance. <br /> 84. The applicant and/or project developer shall work with the adjacent property owners (i.e., Shaklee <br /> and Kaiser) regarding the construction of an ADA compliant trail from Hacienda Drive to Owens <br /> Drive along the northern and eastern property line that will provide ADA access from all properties. <br /> 85. The applicant and/or project developer shall restripe eastbound Owens Drive east of Chabot Drive <br /> to provide a continuous Class II bike lane from Chabot Drive to Willow Road. This improvement <br /> will link project bike lanes with bike lanes west of Chabot Drive (scheduled for installation in <br /> summer 2012). The proposed striping changes shall conform to striping modifications previously <br /> identified in these conditions of approval. These improvements and plan notes shall be shown on <br /> the plans submitted to the Building and Safety Division for plan check to the satisfaction of the City <br /> Engineer and City Traffic Engineer and shall be subject to the review and approval of the City <br /> Engineer prior to building permit issuance. <br /> 86. The applicant and/or project developer shall improve striping along Willow Road between Owens <br /> Drive and Gibraltar Drive (north) and along Gibraltar Drive (north) between Willow Road and <br /> Hacienda Drive to conform to these conditions of approval and the Hacienda TOD Standards and <br /> Design Guidelines. The striping changes are required to ensure that the project does not create <br /> discontinuous and/or disjointed striping along sections of these roads. These improvements and <br /> plan notes shall be shown on the plans submitted to the Building and Safety Division for plan <br /> check to the satisfaction of the City Engineer and City Traffic Engineer and shall be subject to the <br /> review and approval of the City Engineer prior to building permit issuance. <br /> 87. The applicant and/or project developer shall include provisions for a Class II bike lane on Willow <br /> Road to link existing bike lanes south of Gibraltar Drive (North). Striping improvements and lane <br /> geometries shall be approved by the City Traffic Engineer. This improvement shall be shown on <br /> the plans submitted to the Building and Safety Division for plan check. <br /> PUD-65-08-12D and P11-0856 Hacienda TOD Site 1, BRE <br /> Conditions of Approval 9 of 25 Mixed-Use Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.