Laserfiche WebLink
t.Mitigation Monitoring and Reporting Program <br /> TABLE&t(Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Sitats) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> plans. <br /> Field inspections <br /> during <br /> constNCbon. <br /> Mitigation Manure 4.J-5a:Prior to PUD approval.is potential All Project applicant wilt Community Community Development Prior to PUD •Verified by <br /> site for rezoning would add traffic noise in excess of 55 dBA as prepare an acoustical Development Department-Review and approval- <br /> descdbed in Table 4 Jb.the project applicant shall conduct an assessment that adheres to Department approve acoustical Approval of ' <br /> off-site noise study to determine the project's contribution to off- all specifications of this consultant,review and consultant. 'Dale: <br /> site roadway noise and contribute Its fair-share to mitigate the measure. approve acoustical assessment, <br /> established noise impact. City of Pleasanton assessment,and collection noise reduction <br /> Projectte fair-share will City Council of payment, concept,and <br /> contribute tali-share to contribution <br /> mitigate identified noise City of Pleasanton City amount. <br /> impacts. Council-Review and <br /> approval of concept to • <br /> reduce noise level(e.g., Prior to approval <br /> repaving with noise of building <br /> attenuating pavement)so <br /> that fair share contribution permits- <br /> can be assessed.Approve Payment • <br /> contribution amount. • <br /> Mitigation Measure 44-5b:My residential or office buildings All Project applicant will Community Review and approval Prior to approval Verified by' <br /> that be built to California's interior-noise insulation standard so prepare an acoustical Development acoustical consultant. of building , <br /> that interior traffic noise exposure does not exceed 45 dB Ldn. assessment that adheres to Department Review and approve permits. <br /> Before building permits are issued,the project applicant shall be all specifications of this acoustical assessment and Date: <br /> required to submit an acoustical analysis demonstrating that the measure. design plans. <br /> buildings have been designed to limit interior traffic noise If noise thresholds are Field inspections <br /> exposure to a level of 45 dB LtlNCNEL or lave. exceeded,reasonable and during <br /> feasible mitigation will be Inspect site during construction. <br /> required to reduce levels to construction to ensure <br /> City standards, compliance with project <br /> constructon plane. • <br /> • <br /> Mitigation Measure 4.J-5e:Any locations of outdoor activity for All Project applicant will Community Community Development Community Verified by: <br /> sensitive uses associated with the project site shall be designed i prepare an acoustical Development Department-Review and Development <br /> so that the noise exposure from traffic does not exceed 85 dB assessment and prepare Department approve acoustical Department to <br /> Lin at these activity areas.This shall be done thru site site designs that adhere to consultant and assessment. approve Date: <br /> orientation(i.e.,location of activity areas away from roadways or all specifications of this Verify inclusion of approved consultant and <br /> __—Ranh �i3 <br /> General M Mxnenene rent ReeIa ESA r 112011 <br /> rnW svpu.n.am EnnmrinwnW intre awn o..w.1w mtt <br />