Laserfiche WebLink
6.Mitigator Monhnnng and Hemming Program <br /> TABLE 6-1(Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> SiteIs) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures mooted Procedures Responsibility Action Schedule Compliance <br /> if project activities will occur during the non-breeding <br /> season(September 1 through January 31),a second pre- <br /> construction survey shall be conducted for burrowing owl <br /> to document wintering owls that have migrated to the <br /> project site,as well as breeding owls that may have left <br /> the project site.If owls are not detected during this • <br /> survey,project wok can move forward as proposed. <br /> H occupied burrows are detected during this survey and <br /> can be avoided,project activities shall not occur within • <br /> 160 feel of occupied burrows. <br /> N If occupied burrows cannot be avoided,one-way doors <br /> shall be installed to passively relocate burrowing owls <br /> away from active work areas.Two natural burrows or one <br /> • <br /> artificial burrow shall be provided in adjacent grassland <br /> habitat for each one-way door installed In an active <br /> burrow.One-way doors shall remain in place for de <br /> hours.The project site shalt be monitored daily for up to • <br /> one week to ensure owls have moved to replacement • <br /> burrows. <br /> N Once unoccupied.burrows shall be excavated by hand and <br /> backfied to prevent owl occupation.Mien feasible,other <br /> unoccupied burrows in ground disturbance area should <br /> also be excavated by hand and backfilled.Depending on <br /> the California red-legged frog and California tiger <br /> salamander Habitat Assessment results the project site <br /> may require a pre-construction survey tor these species as <br /> well before burrows can be cdlepeed. <br /> Mitigation Measure 4.0-1d:Compensatory mitigation for 18,20 The project applicant wiN Community Review verification. Prior to issuance Verified by <br /> annual grassland habitat providing potentially suitable compensate for lost Development of grading or <br /> habitat for burrowing owl.Annual grasslands at Sites 18 and burrowing owl habit as Department building permit, <br /> 20 may provide foraging,nesting,Of wintering habitat for described in this measure whichever is <br /> Dafe: <br /> burrowing owl.it burrowing owls are found to be absent through and provide veritcaeon that sooner. <br /> the surveys prescribed above,then consistent with standard compensation as described <br /> CDFG mitigations standards and ratios.annual grassland in the measure has <br /> habitat at Sites 18 and 20 shall be compensated for eta ratio of <br /> occurred. <br /> 1:1.If burrowing owls are found to be occupying Sites 18 or 20, <br /> then compensatory mitigation shall be required ate ratio of 3:1, <br /> acres replaced to acres lost.The project applicant may fulfill this <br /> obligation by purchasing annual grassland property suitable tor. <br /> or occupied by,burrowing owl.Such and shall be protected in <br /> perpetuity through an endowed conservation easement. <br /> Altematvely,the project applicant may purchase credits In an <br /> General Pa,...WWI rant Ratw,^J ESA./210014 <br /> [sly&gpamxWl Enmm�mnl/Impwl bP}I December nil <br />