My WebLink
|
Help
|
About
|
Sign Out
RES 12492
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2012
>
RES 12492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2012 4:03:35 PM
Creation date
1/13/2012 2:57:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/4/2012
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 12492
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
exceed 65 dB Ldn at these activity areas. This shall be done thru site orientation <br /> (i.e., location of activity areas away from roadways or shielded by project <br /> buildings) or with the inclusion of appropriate noise barriers. Prior to PUD <br /> approval, the project applicant shall be required to submit an acoustical analysis <br /> demonstrating that outdoor activity spaces associated with sensitive uses do not <br /> exceed 65 dB Ldn within these spaces. <br /> Site(s) affected: All <br /> (Draft SEIR, pp. 4.J-35 to 4.J-36.) <br /> 7. Public Services and Utilities <br /> Impact 4.L-2 <br /> Development facilitated by the General Plan Amendment and rezonings could <br /> potentially require new or expanded water supply resources or entitlements. <br /> The SEIR evaluates the impact of the proposed project related to the potential <br /> need for new or expanded water supply resources or entitlements. New housing development <br /> as facilitated on the potential sites for rezoning by the proposed Housing Element would <br /> increase demand for water and could require new water supply sources. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes or alterations have been required in or incorporated into the <br /> Project that would avoid or substantially lessen the significant environmental <br /> effect as identified in the SEIR. Mitigation Measure 4.L-2 which is required in or <br /> incorporated into the Project, will reduce the significant environmental impact to a <br /> less than significant level. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 1. Future water demand resulting from new development has <br /> been addressed by Zone 7's capital improvement projects to secure more water. <br /> In order to meet future needs, Zone 7 plans to improve conveyance, storage, and <br /> groundwater recharge and extraction facilities to accommodate the growth <br /> outlined in its customers' general plans, which include the City of Pleasanton and <br /> the proposed Housing Element. To further ensure supply is adequate, the City <br /> has developed a Condition of Approval in the 2011 WSA for residential <br /> development on the potential sites for rezoning. <br /> 2. Implementation of Mitigation Measure 4.L-2 set forth in <br /> Table 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.L-2 <br /> would be reduced to a less than significant level and is hereby incorporated by <br /> reference and described below. <br /> 4.L-2: Prior to the recordation of a Final Map, the issuance of a grading permit, <br /> the issuance of a building permit, or utility extension approval to the site, <br /> whichever is sooner, the applicant shall submit written verification from Zone 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.