Laserfiche WebLink
no grading plan is required, necessary erosion control/stormwater quality <br /> measures shall be shown on the site plan submitted for an on-site permit, <br /> subject to the review and approval of the Building and Safety Division. <br /> The project applicant is responsible for ensuring that the contractor is <br /> aware of and implements such measures; <br /> b. Gather all sorted construction debris on a regular basis and place it in the <br /> appropriate container for recycling; to be emptied at least on a weekly <br /> basis. When appropriate, use tarps on the ground to collect fallen debris <br /> or splatters that could contribute to stormwater runoff pollution; <br /> c. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked-on mud and dirt from these areas before sweeping; <br /> d. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding; <br /> e. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain system <br /> through being windblown or in the event of a material spill; <br /> f. Never clean machinery, equipment, tools, brushes, or rinse containers into <br /> a street, gutter, or storm drain; and <br /> g. Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into street, gutters, or storm drains. <br /> C. Operation Requirements <br /> 1. The Permit's operation and maintenance requirements include but are not <br /> limited to the following: The operation and maintenance of treatment <br /> measures including but not limited to bio-swales, lawns, landscaped areas <br /> with deep-rooted plants, oil/water separator, filterra units, etc., requires <br /> completing, signing and recording an agreement with Alameda County <br /> recorder's office in a format approved by the State and Alameda County. <br /> END <br /> P11-709/P11-0717 205 Neal Street <br /> Draft Conditions of A..roval 11 of 11 New Single-Family Home <br />