My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
011012
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 12:40:09 PM
Creation date
1/6/2012 12:40:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/10/2012
DESTRUCT DATE
15Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Contractor's Warranty. Contractor shall bear the risk of loss or damage to any goods <br /> associated with the services until delivered to and accepted by City. Contractor further warrants that all <br /> work done and goods provided under this Agreement shall: a) meet all conditions of the Agreement; b) <br /> shall be free from all defects in design, material and workmanship; and 3) shall be fit for the purposes <br /> intended. If any defects occur within the 12 months following acceptance, Contractor shall be solely <br /> responsible for the correction of those defects. <br /> 8. Labor Code/Prevailing Wages. The work performed under this Agreement is a"public <br /> work" and prevailing wage laws shall apply. No less than the general prevailing rate of per diem wages, <br /> and not less than the general prevailing rate of per diem wages for holidays and overtime work, for each <br /> craft, classification or type of worker needed to execute the work under this Agreement shall be paid to all <br /> workers, laborers and mechanics employed in the execution of the work by the Contractor or any <br /> subcontractor doing or contracting to do any part of the work. The appropriate determination of the Director <br /> of the California Department of Industrial Relations shall be filed at the City Clerk's Office and available <br /> for inspection. Contractor shall post, at each job site, a copy of the prevailing rate of per diem wages. <br /> To the extent applicable, Contractor shall comply with all requirements of the California Labor <br /> Code, including but not limited to, Labor Code sections: 1773.2 (regarding posting wage determinations at <br /> each job site); section 1776 (regarding the certification, maintenance, and availability for inspection of <br /> payroll records); section 1777.5 (regarding employment of apprentices); section 1810 (regarding a legal <br /> day's work as 8 hours of labor); and section 1775 (regarding penalties for violations). The Contractor shall <br /> forfeit fifty dollars ($50.00) for each calendar day or portion thereof for each worker paid less than the <br /> stipulated prevailing rates for any public work done under the Agreement by it or by any subcontractor <br /> under Contractor. <br /> 9. Notices. All notices, demands, requests or approvals to be given under this <br /> Agreement shall be given in writing and conclusively shall be deemed served when delivered <br /> personally or on the second business day after the deposit thereof in the United States Mail, postage <br /> prepaid, registered or certified, addressed as hereinafter provided. <br /> To Contractor: To City: City Manager <br /> City of Pleasanton <br /> 123 Main Street <br /> Pleasanton, CA 94566 <br /> Page 3 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.