Laserfiche WebLink
a. The project developer shall include erosion control/stormwater quality measures on <br /> the final grading plan which shall specifically address measures to prevent soil, dirt, <br /> and debris from entering the storm drain system. Such measures may include, but <br /> are not limited to, hydroseeding, hay bales, sandbags, and siltation fences and are <br /> subject to the review and approval of the City Engineer/Chief Building Official. If no <br /> grading plan is required, necessary erosion control/stormwater quality measures <br /> shall be shown on the site plan submitted for an on-site permit, subject to the review <br /> and approval of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and implements such <br /> measures. <br /> b. All cut and fill slopes shall be revegetated and stabilized after completion of grading, <br /> but in no case later than October 15. Hydroseeding shall be accomplished before <br /> September 15 and irrigated with a temporary irrigation system to ensure that the <br /> grasses are established before October 15. No grading shall occur between October <br /> 15 and April 15 unless approved erosion control/stormwater quality measures are in <br /> place, subject to the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent landscaping is place. <br /> c. Gather all sorted construction debris on a regular basis and place it in the <br /> appropriate container for recycling; to be emptied at least on a weekly basis. When <br /> appropriate, use tarps on the ground to collect fallen debris or splatters that could <br /> contribute to stormwater runoff pollution. <br /> d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br /> and storm drains adjoining the site. Limit construction access routes onto the site <br /> and place gravel on them. Do not drive vehicles and equipment off paved or <br /> graveled areas during wet weather. Broom sweep the street pavement adjoining the <br /> project site on a daily basis. Scrape caked-on mud and dirt from these areas before <br /> sweeping. <br /> e. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt <br /> flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br /> effectiveness and to prevent street flooding. <br /> f. Create a contained and covered area on the site for the storage of cement, paints, <br /> oils, fertilizers, pesticides, or other materials used on the site that have the potential <br /> of being discharged into the storm drain system through being windblown or in the <br /> event of a material spill. <br /> g. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br /> gutter, or storm drain. <br /> h. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br /> discharge wash water into street, gutters, or storm drains. <br /> C. Operation Requirements <br /> The Permit's operation and maintenance requirements include but are not limited to the <br /> following: The operation and maintenance of treatment measures including but not <br /> Ordinance No. 2023 <br /> Exhibit A Page 15 of 18 <br />