Laserfiche WebLink
City of Pleasanton <br /> Restaurant-Full Service Sewer Capacity Fee Worksheet <br /> Customer Name: Habit Burger Description: 2,159sf TI in new shell building <br /> Address: 6770 Bernal Ave Shell purchased sewer at commerical/retail <br /> rate of 0.05gpd/sf. <br /> Flow coefficient based upon data from El Tor <br /> Phone: restaurant and water bills, 0.339gpd/sf. <br /> Assumptions: (Based on data from January 1984 Lowry Report,District Flow Coefficient Research and/or data submitted.) <br /> 1. Biochemical oxygen demand (BOD) = 725 mg/I <br /> 2. Suspended Solids (SS) = 275 mg/I <br /> 3. Flow coefficient(gpd/sf) = 0.339 gpd/sf <br /> 4. Applicable square footage= 2159 sf <br /> Connection fee charges presently in effect: <br /> A. DSRSD Sewer Connection Fee: <br /> 1. Cost per gallon of flow= $60.44 /gallon per day <br /> 2. Cost per pound for BOD= $1,380.03 /pound of BOD per day <br /> 3. Cost per pound for suspended solids = $726.18 /pound of SS per day <br /> B. City of Pleasanton Sewer Connection Fee: <br /> 1. Cost for flow component= $2.27 /gallon per day <br /> 2. No local charge for BOD&SS 0 <br /> Calculation: <br /> Flow(gpd) 2159 sf X 0.339 gpd/sf= 731.90 gpd <br /> Strength Calculation: gpd X 8.34 lbs/g X mg/I/1,000,000= pounds/day <br /> Itemized <br /> A. DSRSD Sewer Connection Fee: Net Cost $/sf <br /> 1. Flow(gpd) 731.90 less credit* 108.02 = 623.88 $37,707.31 <br /> 2. BOD(lbs/day) 4.4254 less credit' 0.2063 = 4.2191 $5,822.48 <br /> 3. SS (lbs/day) 1.6786 less credit* 0.2207 = 1.4579 $1,058.70 <br /> $44,588.49 $20.65 <br /> B. City of Pleasanton Sewer Connection Fee: <br /> 1. Flow(gpd) 731.90 less credit* 108.02 = 623.88 $1,416.21 <br /> Total Sewer Connection Fee $46,004.70 $21.31 <br /> PURCHASED CAPACITIES: <br /> Flow D.U.E.s @ 220 gpd/DUE= 2.84 D.U.E.(s) <br /> BOD = 4.22 lbs/day <br /> SS = 1.46 lbs/day <br /> *See Building Permit No. COMN 200189 CREDIT CASE 2 <br /> Date: 10/25/2011 NET CHARGE $46,004.70 <br /> Prepared by: DMC <br /> File: B11-0973 SEE BUILDING PERMIT FEE INVOICE FOR TOTAL CHARGES. <br /> Note: One DUE is used for residential connection fees and is based on normal domestic strength wastewater and <br /> 220 gpd/single family detached house. <br /> DUE Estimate-Full Service <br />