My WebLink
|
Help
|
About
|
Sign Out
ORD 1040
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1001 - 1100
>
ORD 1040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:44:40 PM
Creation date
3/23/1999 3:53:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
79. That the ped/bike ways at the major entrances be <br /> separated from the curb lines by a minimum of 5 ft. <br /> unless otherwise approved by the City Engineer. <br /> <br />80. That the design, location, and type of signals and <br /> electroliers be approved by the City Engineer prior to <br /> the start of construction. <br /> <br />81. That all curbs on public streets without parking lanes be <br /> constructed as 8" vertical P.C.C. curb and gutter. <br /> <br />82. That all trees proposed to be planted within street right- <br /> of-way areas be selected from the approved.street tree <br /> list or receive approval from the City Engineer on a <br /> specific request basis. <br /> <br />83. That the CC&R's include a requirement that the property <br /> owner's association pay the City an annual fee for the <br /> maintenance of the public streets within the development <br /> for the first ten (10) years after acceptance of the <br /> streets for maintenance. The amount of this fee shall <br /> be determined by the City Engineer and shall be suffi- <br /> cient to cover anticipated City costs during this ten <br /> (10) year period. <br /> <br />84. That a detailed grading and drainage plan and all <br /> supporting information and design criteria be <br /> submitted as part of the improvement plans for the <br /> development. <br /> <br />S5.- That all existing wells, septic tanks or holding <br /> tanks on the site be properly sealed, filled and <br /> abandoned prior to the start of grading operations <br /> unless Zone 7 retains specific wells for observation <br /> wells, or special approval is obtained from the City <br /> Engineer for temporary use of an existing well for <br /> construction water. <br /> <br />86. That the haul route for all materials to and from <br /> this development be approved by the City Engineer <br /> prior to approval of the final map or the start of <br /> any construction. <br /> <br />S7. That the developer submit a dust control plan <br /> as part of the improvement plans prior to approval <br /> of the final map. <br /> <br />88.. That storm drainage swales, gutters, inlets, outfalls <br /> and channels not within the area of a dedicated public <br /> street or public service easement or not dedicated to <br /> Alameda County Flood Control District - Zone 7 be <br /> privately maintained by the property owners or through <br /> an association approved by the City. <br /> <br /> 16 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.