My WebLink
|
Help
|
About
|
Sign Out
ORD 1040
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1001 - 1100
>
ORD 1040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:44:40 PM
Creation date
3/23/1999 3:53:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Widen Santa Rita Road to at least four lanes (on an <br /> interim basis) from West Las Positas Boulevard to <br /> 1-580. <br /> <br /> e.Install signal at Hopyard Road/Inglewood Drive. <br /> <br /> Install signal at Hopyard Road/Gibraltar Drive. <br /> <br /> g. Install signal at Hopyard Road/Valley Trails <br /> Drive (North) - (Arthur Drive). <br /> <br /> h. Modify the following signals: <br /> <br /> Hopyard Road/Valley Avenue <br /> Hopyard Road/Valley Trails Drive'(South)-(Parkside Drive) <br /> Hopyard Road/West Las Positas Boulevard <br /> Hopyard Road/Stoneridge Drive <br /> Hopyard Road/Johnson Drive <br /> Santa Rita Road/West Las Positas Boulevard <br /> Santa Rita Road/Pimlico ' <br /> <br />At such time as it appears that any of the intersections listed <br />in Table V of the NPTS, Volume 3 (with the exceptions and <br />additions listed above) may reach LOS E, no construction <br />on the site not already started may be commenced or approved <br />until the developer performs a traffic analysis, satisfactory <br />to the City, to determine which specific measures described <br />in the following subparagraphs should be constructed to <br />mitigate the traffic conditions at the particular intersection~s) <br />in order to maintain it at LOS D. New construction on the <br />subject site shall be allowed or approved only when the traffic <br />improvements so required are under construction. The mitigating <br />conditions shall be but are not necessarily limited to the <br />following: <br /> <br /> a. Construction of Stoneridge Drive/I-680 interchange. <br /> <br />b. Widening and improvement of the Hopyard Road/I-580 <br /> interchange. <br /> <br />c. Widening of Santa Rita Road to six lanes from <br /> 1-580 to Valley Avenue. <br /> <br />d. Construction of 1-580/Hacienda Drive interchange, <br /> and extension of Hacienda Drive to that inter- <br /> change. <br /> <br />e. Widening and improvement of 1-580/Santa Rita Road <br /> interchange. <br /> <br />f. Widening of Stoneridge Drive to six lanes between <br /> Foothill Road and Hopyard Road. <br /> <br /> 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.