Laserfiche WebLink
5. Subcontractors and their sub-bids for work included in all bid items and additive or deductive alternates are <br /> listed on the attached Document 00432 Subcontractors List. <br /> 6. The undersigned understands that City reserves the right to reject this Bid. The Contract if awarded, will be <br /> based on the lowest bid for the Total Bid(Bid Schedules I through VIII).The City reserves the right to award <br /> only Bid Schedules I through V or Bid Schedules 1 through V and any combination of Bid Schedules VI <br /> through VIII. <br /> 7. If written notice of the acceptance of this Bid,hereinafter referred to as Notice of Award,is mailed or delivered <br /> to the undersigned Bidder within the time described in Section 2 above or at any other time thereafter before it <br /> is withdrawn, the undersigned will execute and deliver the documents required by. Document 00200 <br /> Instructions to Bidders including, but not limited to, Document 00520 Agreement, Document 00610 <br /> Construction Performance Bond, Document 00612 Construction Labor and Material Bond, and Document <br /> 00614 Maintenance Bond,all within the time and in the manner specified in Document 00200 Instructions to <br /> Bidders. <br /> 8. Notice of Award or request for additional information may be addressed to the undersigned at the address set <br /> forth below. <br /> 9. The undersigned herewith encloses a cashier's check or certified check of or on a responsible bank in the <br /> United States,or a corporate surety bond furnished by a surety authorized to do a surety business in the State of <br /> California,in the amount of ten percent(10%)of the total of Bid Schedules I through VIII and made payable to <br /> City of Livermore. <br /> 10. The undersigned agrees to commence work under the Contract Documents on the date established by the <br /> Contract Documents and to complete all work within the time specified in Document 00520 Agreement. <br /> 1 I. The undersigned agrees that,in accordance with Document 00700 General Conditions,liquidated damages for <br /> failure to complete all work in the contract within the time specified in Document 00520 Agreement shall be as <br /> set forth in Document 00520 Agreement. <br /> • <br /> BID FORM <br /> City of Livermore DOCUMENT 00410-PAGE 2 <br /> 0410-.maj—05105 <br />