My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
111511
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2011 3:26:56 PM
Creation date
11/9/2011 12:11:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/15/2011
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70.The project applicant and/or the project applicant's contractor(s) shall obtain <br /> an encroachment permit from the City Engineer prior to moving any <br /> construction equipment onto the site. <br /> 71.The project applicant shall include erosion control measures on the final <br /> grading plan, subject to the approval of the City Engineer. The project <br /> applicant is responsible for ensuring that the contractor is aware of such <br /> measures. All cut and fill slopes shall be revegetated and stabilized as soon <br /> as possible after completion of grading, in no case later than October 15. No <br /> grading shall occur between October 15 and April 15 unless approved erosion <br /> control measures are in place, subject to the approval of the City Engineer. <br /> Such measures shall be maintained until such time as permanent <br /> landscaping is in place. <br /> 72.Storm drainage swales, gutters, inlets, outfalls, and channels not within the <br /> area of a dedicated public street or public service easement approved by the <br /> City Engineer shall be privately maintained by the property owners or through <br /> an association approved by the City. <br /> 73.The project developer shall submit a dust control plan or procedure as part of <br /> the building permit plans. <br /> Building <br /> 74.AII retaining walls higher than four feet from the top of the wall to the bottom <br /> of the footway shall be constructed of reinforced concrete, masonry, or other <br /> material as approved by the Director of Community Development, or shall be <br /> an approved crib wall type. Calculations signed by a registered civil engineer <br /> shall accompany the wall plans. <br /> 75.At the time of building permit plan submittal, the project applicant shall submit <br /> a final grading and drainage plan prepared by a licensed civil engineer <br /> depicting all final grades and on-site drainage control measures to prevent <br /> stormwater runoff onto adjoining properties. <br /> Fire <br /> 76.The project applicant shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 77.Prior to any construction framing, the project applicant shall provide adequate <br /> fire protection facilities, including, but not limited to a water supply and water <br /> flow in conformance to the City's Fire Department Standards able to suppress <br /> a major fire. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.