My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
101811
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2011 3:24:58 PM
Creation date
10/13/2011 3:24:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/18/2011
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Annual Work Plan 2011/2012 ATTACHMENT <br /> QUALITY OF LIFE Cont'd <br /> Parks, Open Space and Public Lands <br /> Pleasanton Ridgelands Access--Acquisition of This project ensures that various open space opportunities are assessed and <br /> Additional Open Space Land _ recommendations provided to Council regarding acquisition and cost. <br /> Alamo Canal Trail Extension With project partners, design and possibly construct the trail gap closure under <br /> 1-580 to eliminate the trail gap on the Alamo/Iron horse trails. (Dependent <br /> u.on financial and staffing resources from project partners). <br /> Parks,Open Space and Public Lands(Continued <br /> Tri-Valley Conservancy Partnerships Explore working with the Tri-Valley Conservancy or similar entities to use <br /> transfer of development rights and conservation easements to preserve open <br /> space. <br /> Iron Horse Trail(permanent alignment) Construction of Iron Horse Trail,from Santa Rita Road to BART Station— <br /> EBRPD has secured grant funding for construction phase. This project will <br /> _ re.uire coordination Cit staff. <br /> Valley Avenue Pedestrian Pathway This project involves relocating the existing pedestrian pathway from the south <br /> side of the existing drainage channel to the north side along Valley Avenue <br /> between Sunol Boulevard and the Alameda County Transportation Corridor.An <br /> eight foot wide asphalt trail will be placed along Valley Avenue with <br /> modifications to the existing landscape.The project includes removal of the <br /> existing path and installation of fencing along portions of the new trail. <br /> Bernal Property Observation Deck& Detention Pond The Bernal Bridge Mitigation Pond was constructed in 2008. This project will <br /> develop an approximately 16'x16' observation deck for use by the general <br /> public to view the flora and fauna on and around the mitigation pond. The deck <br /> will include amenities such as benches, an overhead shade structure, trash <br /> receptacles and signage. The project includes construction of a modest"spur" <br /> trail, to connect the observation deck to the existing Marilyn Murphy Kane Trail. <br /> Staples Ranch Neighborhood Park Construction of a 5 acre neighborhood park located along Stoneridge that <br /> includes; vehicular parking, restroom, pedestrian circulation, pedestrian plaza, <br /> picnic tables, shade structure,two lighted tennis courts, and a stormwater <br /> detention area. The Parks and Recreation Commission approved the Staples <br /> _ Ranch Neighborhood Master Plan design. <br /> QUALITY OF LIFE Cont'd <br /> Downtown <br /> all <br /> Pursue Historic Preservation Guidelines Complete process to implement revised historic preservation guidelines for <br /> Downtown. <br /> Downtown Specific Plan Implementation and Conduct various community workshops to outreach with the community about <br /> Outreach established specific plan guidelines and objectives, collect input and determine <br /> whether changes are necessary through an amended Specific Plan process. <br /> _ Consider additional economic strategies for the downtown. <br /> Downtown(Continued) _ <br /> Lions Wayside and Delucci Park Redevelopment Design two parks consistent with the Downtown Specific Plan and Downtown <br /> Trails Plan. The renovation will compliment the new Firehouse Arts Center. <br /> Encourage Downtown Mixed Use In the Downtown, encourage mixed-use development which incorporates <br /> higher density and affordable residential units consistent with the Downtown <br /> _ S•ecifc Plan, and the historic character of the City. <br /> Downtown Public Art Plan Continue to Implement the Downtown Public Art Plan. <br /> Downtown Hospitality Zone Work closely with the Pleasanton Downtown Association, Pleasanton Police <br /> Department and others key stakeholders to evaluate the creation of a planned <br /> Hos.italit District for the Downtown area. <br /> Recruiting and Retaining Retail Downtown Work closely with the City of Pleasanton's Economic Development <br /> 'Department, Economic Vitality Committee and other key stakeholders to <br /> _ develop and encourage more retail Downtown. <br /> Public Parking Work to increase public parking by working with others toward assessment <br /> districts and future City of Pleasanton improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.