My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
090611
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 11:32:26 AM
Creation date
8/26/2011 11:32:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2011
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY MEDICAL SERCI( ES FIRS] RLSPO'IDER ADVANCED LIFE SURRORH AGREEMENT (11/1/2011) <br /> delivery in the event of a material breach, even if Contractor disagrees with the <br /> determination of material breach. <br /> 16.5 Annual Performance Evaluation <br /> a. The County may evaluate the performance of the Contractor on an annual basis. <br /> Contractor shall provide a report to the County to assist in this evaluation within 60 <br /> calendar days of written notice by County of its intention to conduct a performance <br /> evaluation. <br /> b. The report may require the following information: <br /> • Response Time performance <br /> • Clinical performance in accordance with the Quality Improvement Plan <br /> • Innovative programs that have been initiated to improve system performance <br /> • Update on community education programs and other community initiatives <br /> • Other information as requested by County <br /> • Other information Contractor would like considered by County. <br /> 16.6 Assurance of Performance <br /> a. If at any time, the County believes Contractor may not be adequately performing its <br /> obligations under this Agreement or that Contractor is not performing the Services as <br /> required by this Agreement, County shall provide notice to the Contractor specific <br /> nature of Contractor's deficient performance and may there upon request from <br /> Contractor prompt reply as to the notice of deficiency, and a written plan acceptable to <br /> County, for the correction of deficiencies in Contractor's performance. <br /> b. Contractor shall provide such reply and a written plan within ten (10) calendar days of <br /> the receipt of the County's notice, and shall thereafter diligently commence and fully <br /> perform such written plan. <br /> c. Contractor's failure to reply to such notices or to provide a written plan within the <br /> required time is a material breach of this Agreement. <br /> 16.7 Mutual Termination - This Agreement may be terminated early by mutual consent of the <br /> Contractor and the County. <br /> 16.8 Termination for Cause <br /> a. If Contractor fails to cure any material breach, following notice and opportunity to cure, <br /> County, upon written notice to Contractor, may terminate this Agreement for cause. The <br /> termination shall be effective on the date specified in the written notice. <br /> Page 16 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.