My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
090611
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 4:13:01 PM
Creation date
8/26/2011 11:20:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2011
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEHR 1' PEERS <br /> PROJECT DELIVERY AND FEE ESTIMATES <br /> The schedule and fee for successful completion of a project varies by the number of study intersections, <br /> the number of analysis scenarios, the level of analysis required (i.e. Synchro HCM based calculations or <br /> micro-simulation) and the intended final use of a document such as a negative declaration, mitigated <br /> negative declaration, or an Environmental Impact Report. <br /> As requested, we have provided a preliminary schedule and fee estimate for completion of a standalone <br /> transportation impact study for ten intersections and a transportation impact study for inclusion in an <br /> Environmental Impact Report with up to 25 study intersections. As schedule can be dictated by receipt of <br /> information from third parties, we have also included our proposed schedule of deliverables based on <br /> receipt of information from the City or other parties. The fee estimate includes two meetings for a <br /> standalone study and four meetings for a larger project. Site plan review, parking evaluation, and CMA <br /> analysis would be included in both study types. <br /> Anticipated Standalone Study Environmental <br /> Task/Submittal SubmittaUDependencies (10 intersections) Impact Report <br /> 95 Intersections) <br /> Technical memorandum Receipt of a fully executed <br /> summarizing project trip contract, final project description, <br /> generation and and select zone analysis for each Two weeks Two weeks <br /> distribution assumptions land use proposed within the site <br /> for City review and for the project. <br /> approval - <br /> Technical memorandum Receipt of City approval of the <br /> summarizing traffic previous technical memorandums, <br /> forecasts for City review and final link-and intersection- Three to four weeks Six weeks <br /> and approval level forecasts(.dbf turns file and <br /> loaded network plots). <br /> Draft Transportation Receipt of City approval of the <br /> Study technical memorandum Two to three weeks Four weeks <br /> summarizing the traffic forecasts. <br /> Final Transportation Receipt of comments on the Draft <br /> Study Transportation Study, provided no One week Two weeks <br /> additional analysis is requested. <br /> Responses to Comments Receipt of the applicable <br /> on EIR comments(assuming qualitative N/A Two weeks <br /> transportation related comments) <br /> Time Range Eight to Ten Weeks Fourteen weeks <br /> Estimated Fee Range $10,000 to S25,000 550,000 to S90,000 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.