My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
090611
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 11:20:19 AM
Creation date
8/26/2011 11:20:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2011
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> In accordance with permits required for the construction of Bernal Bridge, mitigations for <br /> wetland and riparian habitat were accomplished both on-site and off-site. The off-site <br /> mitigation area is located at the southwest corner of Valley Avenue and Laguna Creek <br /> Lane, adjacent to Mission Creek on the Bernal Property. The use of the Bernal property <br /> for wetland and riparian mitigation is compatible with the Bernal Property Specific Plan, <br /> which designates this area as agricultural. Per the Specific Plan, agricultural uses were <br /> anticipated to provide "hands-on" lessons in the natural sciences and ecology, and to <br /> provide for a living classroom experience. The created wetland and riparian habitat will <br /> foster these learning activities as stated in the Specific Plan. The addition of an <br /> observation deck adjacent to the pond will allow access to better view the extensive <br /> mitigation that occurred as part of this project and is compatible with the comments <br /> received by the Parks and Recreation Commission at the time of the original pond <br /> creation. <br /> DISCUSSION <br /> Sealed bids for this project were opened on August 19, 2011. A total of five bids were <br /> received with bid amounts ranging from $56,250 to $143,403 (see Attachment 1). The <br /> Architect's estimate for the project was $65,000. <br /> Staff reviewed the bid submitted by the low bidder, J3C Construction, and found it to be <br /> responsible and responsive. Past work performed by this contractor was also verified <br /> and was determined to be satisfactory. Staff recommends award of the construction <br /> contract to J3C Construction <br /> Project funding and estimated expenditures are presented in Attachment 2 to this <br /> report. Staff is recommending a 20% project contingency ($11,250) in order to <br /> accommodate adjustments that may be required during the construction of the project. <br /> The proposed schedule for the project is as follows: <br /> Approval of Plans and Specifications and Award of Contract: September 06, 2011 <br /> Start of Construction: September 14, 2011 <br /> End of Construction: November 2011 <br /> Submitted Fiscal Review: Approve by: <br /> i • 7 iti-- fit.* (A-I r e"— <br /> Brian Dolan Emily Wagner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Bid Summary <br /> 2. Funding and Estimated Expenditures Summary <br /> Page 2 of 2 <br />