My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
081611
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2011 11:36:49 AM
Creation date
8/9/2011 11:36:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/16/2011
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> Tract 7534, Roselyn Lane consists of eleven single-family homes on approximately 4.19 <br /> acres developed by Lynden Homes. Tract 7534 is located along Rose Avenue, west of <br /> Calico Lane, and north of the Alameda County Fairgrounds. The project is complete <br /> and is ready for formal acceptance by the City. <br /> This development extends Rose Avenue approximately 260 feet westerly and includes <br /> two new public streets: Cindy Way and Lynn Drive. <br /> Improvements <br /> All public improvements required of this project have been completed. The City of <br /> Pleasanton will maintain: the streets, including the streetlights (Rose Avenue, Cindy <br /> Way, and Lynn Drive) within this development; the storm drain, sanitary sewer, and <br /> water systems within these streets serving this project; and the landscape strip along <br /> the south side of Rose Avenue. <br /> An eight-foot wide public trail constructed along the Arroyo del Valle is to be maintained <br /> by the homeowner's association (HOA). The portion of the Arroyo del Valle including <br /> the outfall structure within this subdivision's boundaries is the responsibility of the HOA. <br /> Bio-swales along the edge of public streets will be maintained by the HOA, including the <br /> irrigation system and sub-drains. <br /> The public improvements are ready for formal acceptance by the City. <br /> Submitted by: Fiscal Review: Approved joy: <br /> Brian Dolan Emily Wagner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Vicinity Map <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.